Talk:102.2 Contractor Performance Rating System: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Stgemr (talk | contribs)
New page: Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they kno...
 
Smithk (talk | contribs)
mNo edit summary
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they know what and how we are going to rate them.
Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they know what and how we are going to rate them.
Thanks!
Thanks!
Robert St.Gemme SCI Festus Project Office
[[USER:smithk|Keith L. Smith:]]  Thanks for your attention to this! After CM Division provided the file, EPG 102.2 was updated with this form.

Latest revision as of 10:12, 2 July 2014

Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they know what and how we are going to rate them. Thanks! Robert St.Gemme SCI Festus Project Office

Keith L. Smith: Thanks for your attention to this! After CM Division provided the file, EPG 102.2 was updated with this form.