136.5 Agreements: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m Per LPA and CCO, files available to non-MODOT agencies updated
Smithk (talk | contribs)
m Per Design, EPG 136 was generally re-written following thorough research and input from LPAs, consultants and FHWA.
 
Line 1: Line 1:
{|style="padding: 0.3em; margin-left:7px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="470px" align="right"  
{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="240px" align="center"  
|-
|-
|colspan="2"|'''Additional Information for MoDOT Employees'''
|'''This article was deleted'''
|-
|-
|colspan="2"|Refer to [http://wwwi/intranet/cc/Contracts1.asp?nav=modot CCO's intranet webpage] for access to current contractsIn the drop box, select the proper division for access to the desired contract.
|MoDOT deemed this article's information to be obsoleteAs such, it was deletedPlease consult the [[:Category:136 Local Public Agency (LPA) Policy|re-written EPG 136 LPA Policy]].
|-
|colspan="2"|<sup>'''____________'''</sup>
|-
|
|-
|colspan="2"|'''Additional Information for LPAsPDF Files available for:'''
|-
|[[media:136.5.1 HS4.pdf|Fig. 136.5.1 HS 4, Safe Routes to School Program Agreement]]||[[media:136.5.2 RM11.pdf|Fig. 136.5.2 RM 11, STP Urban Program Agreement]]
|-
|[[media:136.5.3 RM12.pdf|Fig. 136.5.3 RM 12, Transportation Enhancement Funds Program Agreement]]||[[media:136.5.3 RM12 ARRA.pdf|Fig. 136.5.3 RM 12 ARRA, Transportation Enhancement Funds Program Agreement, ARRA]]
|-
|[[media:136.5.3.1 RM12 SUP.pdf|Fig. 136.5.3.1 RM 12 SUP, Transportation Enhancement Funds Supplemental Agreement]]||[[media:136.5.4 RM13.pdf|Fig. 136.5.4 RM 13, Off-System Bridge Replacement and Rehabilitation Program Agreement]]
|-
|[[media:136.5.5 RM14.pdf|Fig. 136.5.5 RM 14, On-System Bridge Replacement and Rehabilitation Program Agreement]]||[[media:136.5.6 RM15.doc|Fig. 136.5.6 RM 15, Congestion Mitigation and Air Quality Agreement]]
|-
|[[media:136.5.7 RM16.pdf|Fig. 136.5.7 RM 16, Transportation and Community and System Preservation Program Agreement]]||[[media:136.5.8 RM17.pdf|Fig. 136.5.8 RM 17, Federal Aid Program Agreement]]
|-
|[[media:136.5.8 RM17 ARRA.pdf|Fig. 136.5.8 RM 17 ARRA, Federal Aid Program Agreement, ARRA]]||[[media:136.5.9 RM15E.pdf|Fig. 136.5.9 RM 15E, Congestion Mitigation and Air Quality Agreement (Vehicle and Equipment Purchases)]]
|-
|[[media:136.5.9 RM15 SUP.pdf|Fig. 136.5.9.1 RM 15 SUP, CMAQ Supplement]]||[[media:136.5.10 Sample Ordinance (Fig. 5-10).doc|Fig. 136.5.10 Sample Ordinance]]
|-
|colspan="2" align="center"|[[media:136.5.11 ARRA (Fig. 5-11).doc|Fig. 136.5.11 American Recovery and Reinvestment Act Federal Aid Agreement]]
|}
|}
It will be necessary for the local agency to enter into an agreement with the Missouri Highway and Transportation Commission for each project or group of projects. This is a legal instrument
necessary in order to pass through federal funds and outlines the responsibilities of the local agency and the Missouri Highway and Transportation Commission.
A multi-party or three-party agreement may be necessary if another unit of government such as a township or special road district is involved.
If the local agency elects to construct any portion of the project with its own forces, it will be necessary to include a provision in the agreement that requires the local agency to comply with Section II, Equal Opportunity and Section III, Nonsegregated Facilities, as set out in [http://www.fhwa.dot.gov/programadmin/contracts/1273.pdf FHWA Form 1273]. FHWA Form 1273 will be attached to all project agreements.
The [http://www.modot.mo.gov/ MoDOT district representative] will initiate preparation of the agreement. The district representative will consult with the local agency to pinpoint the various arrangements and details that will be covered. The agreement will first be presented to the local agency for signature. Seven copies of the agreement, signed by the local agency should be submitted to MoDOT's district representative. Projects being constructed by cities must also return 1 copy of an enabling legislation at the time of the execution. After approval and signature by the Missouri Highway and Transportation Commission, a fully executed copy will be returned to the local agency.
If a supplemental agreement is necessary, an ordinance may be required if the original ordinance makes references to specific project information such as but not limited to, amount of federal funds, project timeline or the original agreement. Please refer to [[media:136.5.10 Sample Ordinance (Fig. 5-10).doc|Fig. 136.5.10 Sample Ordinance]] for a sample ordinance. The local agency may elect to fill in the areas providing project descriptions in a general project descriptive manner to preclude the passage of another ordinance.
'''No work is to be initiated on any part of the project until federal funding has been approved (obligated) by FHWA and the local agency has been notified by MoDOT to proceed.'''
[[Category:136 Local Public Agency (LPA) Policy|136.05]]

Latest revision as of 11:53, 23 April 2012

This article was deleted
MoDOT deemed this article's information to be obsolete. As such, it was deleted. Please consult the re-written EPG 136 LPA Policy.