Category:702 Load-Bearing Piles: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

21 November 2024

26 September 2024

27 June 2022

22 June 2022

1 October 2021

11 June 2021

8 March 2021

21 May 2019

17 May 2019

2 March 2018

9 February 2018

  • curprev 15:0915:09, 9 February 2018EPGsysop talk contribs 33,565 bytes +438 Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Grade 36 (ASTM A 709, Grade 36)  and replace it with AASHTO M 270, Grade 50 (ASTM A709, Grade 50). 

19 January 2018

21 April 2017

13 June 2016

1 May 2014

29 April 2014

17 April 2014

7 January 2014

  • curprev 13:2813:28, 7 January 2014Smithk talk contribsm 33,566 bytes +8,786 Per Bridge, driving pile to rock criteria clarified. Eliminated 75% hammer efficiency requirem't for single acting diesel hammers; now require pile pt. reinforcem't on all piles driven to bear on rock

10 October 2013

12 June 2013

13 March 2012

6 July 2011

9 July 2010

1 July 2010

28 June 2010

24 May 2010

26 March 2010

26 June 2009

15 May 2009

14 May 2009

22 December 2008

21 February 2008

27 December 2007

26 December 2007