806.1 Erosion Control Measures: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

15 September 2022

13 September 2022

19 April 2022

  • curprev 12:3812:38, 19 April 2022Smithk talk contribsm 24,580 bytes −2 updated link
  • curprev 12:2712:27, 19 April 2022Smithk talk contribs 24,582 bytes −166 Per Env'l, guidance for seeding, mulching, and temporary seeding reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new Standard Plan 805.00 Seeding) will promote a more effective vegetative establishment, allowing for quicker project finalization. MoDOT is obligated to stabilize disturbed areas with permanent building materials or perennial vegetative cover to minimize erosion and sedimentation of disturbed areas.

17 October 2019

22 July 2019

25 February 2019

22 February 2019

28 September 2018

7 August 2018

  • curprev 10:0110:01, 7 August 2018Smithk talk contribs 24,738 bytes +24,738 Per Env'l, a complete rewrite of EPG 806 to clarify land disturbance requirements and policies necessary to comply with MoDOT's current land disturbance practices.