751.8 Concrete Box Culverts: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

19 July 2024

9 May 2024

6 October 2022

11 January 2022

25 October 2021

16 September 2021

28 July 2020

27 September 2018

11 April 2018

9 February 2018

  • curprev 17:0017:00, 9 February 2018EPGsysop talk contribs 73,790 bytes +1,153 Per BR, revision addresses collars on precast concrete box culverts when cast-in-place box culverts are called for. When/how geotextile fabric is used on precast joints was revised

27 April 2017

1 March 2017

15 February 2017

12 July 2016

14 June 2016

13 May 2015

20 August 2014

12 August 2014

11 June 2014

22 April 2014

12 March 2013

7 March 2013

9 March 2012

6 March 2012

27 February 2012

10 February 2012

21 September 2011

3 May 2011

  • curprev 09:5209:52, 3 May 2011Smithk talk contribs 72,790 bytes +72,790 Re-titled (was 751.8 LFD Culverts; old article used LFD Bridge Design Manual). FHWA mandates that all bridges and foundations be designed in accordance with LRFD Bridge Design specs.