751.33 Concrete Semi Deep Abutments: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 January 2022

5 August 2020

10 June 2020

22 April 2014

10 February 2012

15 April 2010

5 April 2010

  • curprev 10:5810:58, 5 April 2010Smithk talk contribsm 18,347 bytes −4 minor clarifications to differentiate EPG articles (that are referenced as "articles", not "sections") from specifications (that are referenced as "sections")

30 September 2009

22 June 2009

  • curprev 12:3412:34, 22 June 2009EPG-Admin talk contribs 18,303 bytes +186 Change minimum distance from 9" to 8" from outside edge of pile to face of beam on concrete pile cap integral and non-integral end bents, intermediate pile cap bents, semi-deep abutment beam caps.

28 September 2007