626.2 Centerline Rumble Strips: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

24 October 2022

6 October 2022

4 October 2022

3 June 2022

27 July 2021

  • curprev 12:4212:42, 27 July 2021Smithk talk contribsm 2,455 bytes −39 Per TS, replaced now-archaic special sheet with link to new Std. Plan 626.00. Also updated typical section sheet to reflect new Std. Plan 626.00.

4 June 2021

12 November 2020

26 April 2019

23 October 2018

  • curprev 12:3312:33, 23 October 2018Smithk talk contribs 2,579 bytes +2,579 Per CM, clarified the location of the rumbles strips and pavement markings for differing shoulder and pavement conditions. It also revised the minimum pavement thickness from 1 3/4" to 1".