<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://epgtest3.modot.org/index.php?action=history&amp;feed=atom&amp;title=Demolition_and_Removal_of_Improvements</id>
	<title>Demolition and Removal of Improvements - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://epgtest3.modot.org/index.php?action=history&amp;feed=atom&amp;title=Demolition_and_Removal_of_Improvements"/>
	<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;action=history"/>
	<updated>2026-04-29T03:34:21Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.42.3</generator>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=53993&amp;oldid=prev</id>
		<title>Hoskir: /* Asbestos Containing Materials */ updated per email from CM</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=53993&amp;oldid=prev"/>
		<updated>2024-06-25T14:23:23Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;Asbestos Containing Materials: &lt;/span&gt; updated per email from CM&lt;/span&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 09:23, 25 June 2024&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l35&quot;&gt;Line 35:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 35:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The paragraph below contains language from a [[127.18 Job Special Provisions (JSP) and Contract Documents|JSP]] that pertains to notification requirements. The time frame for notification is to be included. Note that two, separate 10-day notifications are required, one for demolition and one for removal of ACM.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The paragraph below contains language from a [[127.18 Job Special Provisions (JSP) and Contract Documents|JSP]] that pertains to notification requirements. The time frame for notification is to be included. Note that two, separate 10-day notifications are required, one for demolition and one for removal of ACM.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The contractor shall complete the proper notification procedures in accordance with the appropriate federal, state, and local laws and regulations for demolition of structures. The notification procedures and forms are available electronically at &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;http&lt;/del&gt;://&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;www.&lt;/del&gt;dnr.mo.gov/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;env/apcp/asbestos.htm &lt;/del&gt;or you may contact the MDNR’s Air Pollution Control Program at 1-800-361-4827. Notification is necessary at least 10 working days in advance of the start date for removal of asbestos or for the demolition of a building with or without reportable quantities of asbestos present. The contractor shall provide copies of all completed and approved forms to the engineer prior to any demolition work. Special attention should be given to the reporting requirements, since MoDOT can be easily cited for violation.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The contractor shall complete the proper notification procedures in accordance with the appropriate federal, state, and local laws and regulations for demolition of structures. The notification procedures and forms are available electronically at &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;https&lt;/ins&gt;://dnr.mo.gov/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;forms-applications &lt;/ins&gt;or you may contact the MDNR’s Air Pollution Control Program at 1-800-361-4827. Notification is necessary at least 10 working days in advance of the start date for removal of asbestos or for the demolition of a building with or without reportable quantities of asbestos present. The contractor shall provide copies of all completed and approved forms to the engineer prior to any demolition work. Special attention should be given to the reporting requirements, since MoDOT can be easily cited for violation.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{| style=&amp;quot;margin: 1em auto 1em auto&amp;quot;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{| style=&amp;quot;margin: 1em auto 1em auto&amp;quot;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|-&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|-&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Hoskir</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=51193&amp;oldid=prev</id>
		<title>Smithk: updated broken link</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=51193&amp;oldid=prev"/>
		<updated>2022-02-18T18:04:41Z</updated>

		<summary type="html">&lt;p&gt;updated broken link&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 13:04, 18 February 2022&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l29&quot;&gt;Line 29:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 29:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===Asbestos Containing Materials===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===Asbestos Containing Materials===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Asbestos removal must be completed prior to demolition of the building. ACM requiring removal will be listed on [[Media:236.13 Form T748.doc|T-748]] for each parcel inspected. The contract proposal for asbestos removal should use [http://www.modot.mo.gov/business/contractor_resources/biditemslisting.htm standard bid items]. If all of the parcels have not been inspected for ACM, estimated quantities will be used. Check with a [&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;http&lt;/del&gt;://&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;wwwi&lt;/del&gt;/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;design&lt;/del&gt;/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;default.htm &lt;/del&gt;Design] technical support engineer for assistance with this procedure. When quantities of ACM to be removed inside a single structure exceed 35 ft&amp;lt;sup&amp;gt;3&amp;lt;/sup&amp;gt;, 160 ft&amp;lt;sup&amp;gt;2&amp;lt;/sup&amp;gt; or 260 linear feet (80 m), third party air monitoring is required. A licensed Contractor Supervisor must oversee the abatement.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Asbestos removal must be completed prior to demolition of the building. ACM requiring removal will be listed on [[Media:236.13 Form T748.doc|T-748]] for each parcel inspected. The contract proposal for asbestos removal should use [http://www.modot.mo.gov/business/contractor_resources/biditemslisting.htm standard bid items]. If all of the parcels have not been inspected for ACM, estimated quantities will be used. Check with a [&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;https&lt;/ins&gt;://&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;modotgov.sharepoint.com/sites&lt;/ins&gt;/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;DE&lt;/ins&gt;/ Design] technical support engineer for assistance with this procedure. When quantities of ACM to be removed inside a single structure exceed 35 ft&amp;lt;sup&amp;gt;3&amp;lt;/sup&amp;gt;, 160 ft&amp;lt;sup&amp;gt;2&amp;lt;/sup&amp;gt; or 260 linear feet (80 m), third party air monitoring is required. A licensed Contractor Supervisor must oversee the abatement.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The project manager will ensure there is close coordination between the district staff concerning right-of-way acquisition, plan development, and contract administration for the removal of all improvements. The environmental specialist can assist with additional resources for hazardous waste screening, materials testing, and contract proposal preparation as needed.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The project manager will ensure there is close coordination between the district staff concerning right-of-way acquisition, plan development, and contract administration for the removal of all improvements. The environmental specialist can assist with additional resources for hazardous waste screening, materials testing, and contract proposal preparation as needed.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=48218&amp;oldid=prev</id>
		<title>Smithk: updated link</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=48218&amp;oldid=prev"/>
		<updated>2020-08-19T18:34:43Z</updated>

		<summary type="html">&lt;p&gt;updated link&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 13:34, 19 August 2020&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l25&quot;&gt;Line 25:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 25:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*The estimated dates for possession of each parcel and the deadline for needing the inspection report.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*The estimated dates for possession of each parcel and the deadline for needing the inspection report.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;It is important for the inspectors to have either a contact person in the district that is familiar with the properties or photographs of the buildings taken from the road so a positive identification can be made of each structure requiring inspection. Construction and Materials personnel will take samples of all suspected ACM and painted concrete and will report test results to the district on [[Media:236.13 Form T746.doc|Forms T-746]], [[Media:236.13 Form T747.doc|T-747]], and [[Media:236.13 Form T748.doc|T-748]]. All contract proposals requiring asbestos abatement or demolition of buildings and bridges must include copies of these forms. Only the ACM listed on Form T-748 will be tabulated for removal. If there are questions regarding proper disposal or handling of the material, the district should contact the [http://&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;wwwi&lt;/del&gt;/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;design&lt;/del&gt;/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;EnvironmentalStudies&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;htm &lt;/del&gt;Environmental Section of Design] for guidance.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;It is important for the inspectors to have either a contact person in the district that is familiar with the properties or photographs of the buildings taken from the road so a positive identification can be made of each structure requiring inspection. Construction and Materials personnel will take samples of all suspected ACM and painted concrete and will report test results to the district on [[Media:236.13 Form T746.doc|Forms T-746]], [[Media:236.13 Form T747.doc|T-747]], and [[Media:236.13 Form T748.doc|T-748]]. All contract proposals requiring asbestos abatement or demolition of buildings and bridges must include copies of these forms. Only the ACM listed on Form T-748 will be tabulated for removal. If there are questions regarding proper disposal or handling of the material, the district should contact the [http://&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;sp&lt;/ins&gt;/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;sites&lt;/ins&gt;/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;de/environmental_historic_pres/SitePages/Home&lt;/ins&gt;.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;aspx &lt;/ins&gt;Environmental &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;and Historic Preservation &lt;/ins&gt;Section of Design] for guidance.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===Asbestos Containing Materials===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===Asbestos Containing Materials===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=30050&amp;oldid=prev</id>
		<title>Smithk: /* Asbestos Containing Materials */ updated link, per SE District resident engineer</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=30050&amp;oldid=prev"/>
		<updated>2012-10-12T13:14:10Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;Asbestos Containing Materials: &lt;/span&gt; updated link, per SE District resident engineer&lt;/span&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 08:14, 12 October 2012&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l35&quot;&gt;Line 35:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 35:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The paragraph below contains language from a [[127.18 Job Special Provisions (JSP) and Contract Documents|JSP]] that pertains to notification requirements. The time frame for notification is to be included. Note that two, separate 10-day notifications are required, one for demolition and one for removal of ACM.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The paragraph below contains language from a [[127.18 Job Special Provisions (JSP) and Contract Documents|JSP]] that pertains to notification requirements. The time frame for notification is to be included. Note that two, separate 10-day notifications are required, one for demolition and one for removal of ACM.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The contractor shall complete the proper notification procedures in accordance with the appropriate federal, state, and local laws and regulations for demolition of structures. The notification procedures and forms are available electronically at &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the following web site location: &lt;/del&gt;http://www.dnr&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;.state&lt;/del&gt;.mo.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;us&lt;/del&gt;/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;alpd&lt;/del&gt;/apcp/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Asbestos&lt;/del&gt;.htm or you may contact the MDNR’s Air Pollution Control Program at 1-800-361-4827. Notification is necessary at least 10 working days in advance of the start date for removal of asbestos or for the demolition of a building with or without reportable quantities of asbestos present. The contractor shall provide copies of all completed and approved forms to the engineer prior to any demolition work. Special attention should be given to the reporting requirements, since MoDOT can be easily cited for violation.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The contractor shall complete the proper notification procedures in accordance with the appropriate federal, state, and local laws and regulations for demolition of structures. The notification procedures and forms are available electronically at http://www.dnr.mo.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;gov&lt;/ins&gt;/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;env&lt;/ins&gt;/apcp/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;asbestos&lt;/ins&gt;.htm or you may contact the MDNR’s Air Pollution Control Program at 1-800-361-4827. Notification is necessary at least 10 working days in advance of the start date for removal of asbestos or for the demolition of a building with or without reportable quantities of asbestos present. The contractor shall provide copies of all completed and approved forms to the engineer prior to any demolition work. Special attention should be given to the reporting requirements, since MoDOT can be easily cited for violation.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{| style=&amp;quot;margin: 1em auto 1em auto&amp;quot;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{| style=&amp;quot;margin: 1em auto 1em auto&amp;quot;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|-&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|-&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=29214&amp;oldid=prev</id>
		<title>Smithk: Per Environmental, inspection process clarified and simplified</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=29214&amp;oldid=prev"/>
		<updated>2012-06-11T12:41:54Z</updated>

		<summary type="html">&lt;p&gt;Per Environmental, inspection process clarified and simplified&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 07:41, 11 June 2012&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l16&quot;&gt;Line 16:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 16:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;It is necessary for all building structures, building remains, and bridges of which MoDOT takes possession to be inspected for the presence of asbestos containing materials (ACM) and heavy-metal-based painted concrete, block, and brick (referred to as “painted concrete”). Heavy-metal based painted concrete, block, and brick are surveyed to determine whether the material can be used as clean fill or if the material requires disposal in a demolition or sanitary landfill. Buildings, building remains/debris, and bridges should be inspected for ACM and painted concrete prior to salvage, demolition, and removal. The inspection methods are invasive and destructive; therefore, the department must have possession before inspection begins. If it is believed there will be salvage of a building by a third party, the request for asbestos/painted concrete, block and brick inspection should stipulate that non-destructive sampling methods be employed.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;It is necessary for all building structures, building remains, and bridges of which MoDOT takes possession to be inspected for the presence of asbestos containing materials (ACM) and heavy-metal-based painted concrete, block, and brick (referred to as “painted concrete”). Heavy-metal based painted concrete, block, and brick are surveyed to determine whether the material can be used as clean fill or if the material requires disposal in a demolition or sanitary landfill. Buildings, building remains/debris, and bridges should be inspected for ACM and painted concrete prior to salvage, demolition, and removal. The inspection methods are invasive and destructive; therefore, the department must have possession before inspection begins. If it is believed there will be salvage of a building by a third party, the request for asbestos/painted concrete, block and brick inspection should stipulate that non-destructive sampling methods be employed.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After MoDOT has taken possession, the district will submit a written request, containing the following information to the State Construction and Materials Engineer for asbestos/painted concrete, block and brick inspection&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After MoDOT has taken possession, the district will submit a written request, containing the following information to the State Construction and Materials Engineer for asbestos/painted concrete, block and brick inspection&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;:&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*Job Number&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*Job Number&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*Parcel numbers to be inspected and the total number of parcels on the project requiring building demolition&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*Parcel numbers to be inspected and the total number of parcels on the project requiring building demolition&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l22&quot;&gt;Line 22:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 22:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*Plan sheets showing the location of all parcels and structures&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*Plan sheets showing the location of all parcels and structures&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*A floor plan sketch of all buildings to be inspected, as may be used for appraisal&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*A floor plan sketch of all buildings to be inspected, as may be used for appraisal&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*The name of the district person to obtain keys from for access&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*The name of the district person to obtain keys from for access &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;and&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*The estimated dates for possession of each parcel and the deadline for needing the inspection report  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*The estimated dates for possession of each parcel and the deadline for needing the inspection report&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;. &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;It is important for the inspectors to have either a contact person in the district that is familiar with the properties or photographs of the buildings taken from the road so a positive identification can be made of each structure requiring inspection. Construction and Materials personnel will take samples of all suspected ACM and painted concrete and will report test results to the district on [&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;http&lt;/del&gt;:&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;//epg&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;modot.mo.gov/forms/CO/Asbestos%20Survey%20Report%20-%20All%20Suspect%20ACM%20%20(&lt;/del&gt;Form&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;%20T746)&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;dot &lt;/del&gt;Forms &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;T746&lt;/del&gt;], [&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;http&lt;/del&gt;:&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;//epg&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;modot.mo&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;gov/forms/CO/Asbestos%20Survey%20Report%20&lt;/del&gt;-&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;%20Nonfriable%20ACM%20(Form%20T747).dot T747&lt;/del&gt;], and [&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;http&lt;/del&gt;:&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;//epg&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;modot&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;mo.gov/forms/CO/Asbestos%20Survey%20Report%20&lt;/del&gt;-&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;%20All%20Materials%20(Form%20T748).dot T748&lt;/del&gt;]. All contract proposals requiring asbestos abatement or demolition of buildings and bridges must include copies of these forms. Only the ACM listed on Form &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;T748 &lt;/del&gt;will be tabulated for removal. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;The environmental specialist in the Design Diviison receives copies &lt;/del&gt;of &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;all asbestos/painted concrete, block, and brick inspection forms for all &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;districts. These inspection forms are reviewed primarily to determine whether any painted concrete&lt;/del&gt;, &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;block or brick surfaces exceed levels allowed for use as clean fill. The environmental specialist will notify &lt;/del&gt;the district &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;personnel identified in &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;memo transmitting the results if there are areas identified in the structure that require disposal in a demolition or sanitary landfill&lt;/del&gt;. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;If a notification is not made, the painted concrete, block, and/or brick (if present) meets the definition &lt;/del&gt;of &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;clean fill and can be managed as such, preferably on MoDOT right of way&lt;/del&gt;.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;It is important for the inspectors to have either a contact person in the district that is familiar with the properties or photographs of the buildings taken from the road so a positive identification can be made of each structure requiring inspection. Construction and Materials personnel will take samples of all suspected ACM and painted concrete and will report test results to the district on [&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;[Media&lt;/ins&gt;:&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;236&lt;/ins&gt;.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;13 &lt;/ins&gt;Form &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;T746&lt;/ins&gt;.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;doc|&lt;/ins&gt;Forms &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;T-746]&lt;/ins&gt;], [&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;[Media&lt;/ins&gt;:&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;236&lt;/ins&gt;.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;13 Form T747&lt;/ins&gt;.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;doc|T&lt;/ins&gt;-&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;747]&lt;/ins&gt;], and [&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;[Media&lt;/ins&gt;:&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;236&lt;/ins&gt;.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;13 Form T748&lt;/ins&gt;.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;doc|T&lt;/ins&gt;-&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;748]&lt;/ins&gt;]. All contract proposals requiring asbestos abatement or demolition of buildings and bridges must include copies of these forms. Only the ACM listed on Form &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;T-748 &lt;/ins&gt;will be tabulated for removal. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;If there are questions regarding proper disposal or handling &lt;/ins&gt;of the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;material&lt;/ins&gt;, the district &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;should contact &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;[http://wwwi/design/EnvironmentalStudies&lt;/ins&gt;.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;htm Environmental Section &lt;/ins&gt;of &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Design] for guidance&lt;/ins&gt;.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===Asbestos Containing Materials===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===Asbestos Containing Materials===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Asbestos removal must be completed prior to demolition of the building. ACM requiring removal will be listed on [&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;http&lt;/del&gt;:&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;//epg&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;modot&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;mo.gov/forms/CO/Asbestos%20Survey%20Report%20&lt;/del&gt;-&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;%20All%20Materials%20(Form%20T748).dot T748&lt;/del&gt;] for each parcel inspected. The contract proposal for asbestos removal should use [http://www.modot.mo.gov/business/contractor_resources/biditemslisting.htm standard bid items]. If all of the parcels have not been inspected for ACM, estimated quantities will be used. Check with a [http://wwwi/design/default.htm Design] &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Liaison Engineer &lt;/del&gt;for assistance with this procedure. When quantities of ACM to be removed inside a single structure exceed 160 ft&amp;lt;sup&amp;gt;2&amp;lt;/sup&amp;gt; or 260 linear feet (80 m), third party air monitoring is required. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;The district project manager will coordinate with the environmental specialist to establish a memorandum of understanding with a certified industrial hygienist or equivalent to monitor &lt;/del&gt;the abatement&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;, prior to commencement of the work&lt;/del&gt;.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Asbestos removal must be completed prior to demolition of the building. ACM requiring removal will be listed on [&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;[Media&lt;/ins&gt;:&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;236&lt;/ins&gt;.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;13 Form T748&lt;/ins&gt;.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;doc|T&lt;/ins&gt;-&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;748]&lt;/ins&gt;] for each parcel inspected. The contract proposal for asbestos removal should use [http://www.modot.mo.gov/business/contractor_resources/biditemslisting.htm standard bid items]. If all of the parcels have not been inspected for ACM, estimated quantities will be used. Check with a [http://wwwi/design/default.htm Design] &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;technical support engineer &lt;/ins&gt;for assistance with this procedure. When quantities of ACM to be removed inside a single structure exceed &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;35 ft&amp;lt;sup&amp;gt;3&amp;lt;/sup&amp;gt;, &lt;/ins&gt;160 ft&amp;lt;sup&amp;gt;2&amp;lt;/sup&amp;gt; or 260 linear feet (80 m), third party air monitoring is required. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;A licensed Contractor Supervisor must oversee &lt;/ins&gt;the abatement.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Once MoDOT has taken possession of a parcel, salvage of any materials or structures will not be permitted until an inspection for asbestos and hazardous waste has been made and all hazardous waste or ACM has been removed. The National Emission Standard for Hazardous Air Pollutants (NESHAP), asbestos regulations of the Environmental Protection Agency, and regulations of the Missouri Department of Natural Resources govern MoDOT operations. &lt;/del&gt;The project manager will ensure there is close coordination between the district staff concerning right-of-way acquisition, plan development, and contract administration for the removal of all improvements. The environmental specialist can assist with additional resources for hazardous waste screening, materials testing, and contract proposal preparation as needed.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The project manager will ensure there is close coordination between the district staff concerning right-of-way acquisition, plan development, and contract administration for the removal of all improvements. The environmental specialist can assist with additional resources for hazardous waste screening, materials testing, and contract proposal preparation as needed.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The paragraph below contains language from a [[127.18 Job Special Provisions (JSP) and Contract Documents|JSP]] that pertains to notification requirements. The time frame for notification is to be included. Note that two, separate 10-day notifications are required, one for demolition and one for removal of ACM.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The paragraph below contains language from a [[127.18 Job Special Provisions (JSP) and Contract Documents|JSP]] that pertains to notification requirements. The time frame for notification is to be included. Note that two, separate 10-day notifications are required, one for demolition and one for removal of ACM.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The contractor shall complete the proper notification procedures in accordance with the appropriate federal, state, and local laws and regulations for demolition of &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;buildings&lt;/del&gt;. The notification procedures and forms are available electronically at &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;[&lt;/del&gt;http://www.dnr.mo.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;gov&lt;/del&gt;/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;forms&lt;/del&gt;/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;index&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;html#AirPollution Asbestos NESHAP Notification of Demolition and Renovation, Form--MO 780-1923] (scroll down to this form under &quot;Asbestos (General)&quot;)  &lt;/del&gt;or you may contact the MDNR’s Air Pollution Control Program at 1-800-361-4827. Notification is necessary at least 10 working days in advance of the start date for removal of asbestos or for the demolition of a building with or without reportable quantities of asbestos present. The contractor shall provide copies of all completed and approved forms to the engineer prior to any demolition work. Special attention should be given to the reporting requirements, since MoDOT can be easily cited for violation.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The contractor shall complete the proper notification procedures in accordance with the appropriate federal, state, and local laws and regulations for demolition of &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;structures&lt;/ins&gt;. The notification procedures and forms are available electronically at &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the following web site location: &lt;/ins&gt;http://www.dnr&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;.state&lt;/ins&gt;.mo.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;us/alpd&lt;/ins&gt;/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;apcp&lt;/ins&gt;/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Asbestos&lt;/ins&gt;.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;htm &lt;/ins&gt;or you may contact the MDNR’s Air Pollution Control Program at 1-800-361-4827. Notification is necessary at least 10 working days in advance of the start date for removal of asbestos or for the demolition of a building with or without reportable quantities of asbestos present. The contractor shall provide copies of all completed and approved forms to the engineer prior to any demolition work. Special attention should be given to the reporting requirements, since MoDOT can be easily cited for violation.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{| style=&amp;quot;margin: 1em auto 1em auto&amp;quot;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{| style=&amp;quot;margin: 1em auto 1em auto&amp;quot;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|-&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|-&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=28876&amp;oldid=prev</id>
		<title>Smithk: References to ten districts and &quot;District 3&quot;, etc. were removed.</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=28876&amp;oldid=prev"/>
		<updated>2012-05-03T18:10:16Z</updated>

		<summary type="html">&lt;p&gt;References to ten districts and &amp;quot;District 3&amp;quot;, etc. were removed.&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 13:10, 3 May 2012&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l25&quot;&gt;Line 25:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 25:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*The estimated dates for possession of each parcel and the deadline for needing the inspection report  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:*The estimated dates for possession of each parcel and the deadline for needing the inspection report  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;It is important for the inspectors to have either a contact person in the district that is familiar with the properties or photographs of the buildings taken from the road so a positive identification can be made of each structure requiring inspection. Construction and Materials personnel will take samples of all suspected ACM and painted concrete and will report test results to the district on [http://epg.modot.mo.gov/forms/CO/Asbestos%20Survey%20Report%20-%20All%20Suspect%20ACM%20%20(Form%20T746).dot Forms T746], [http://epg.modot.mo.gov/forms/CO/Asbestos%20Survey%20Report%20-%20Nonfriable%20ACM%20(Form%20T747).dot T747], and [http://epg.modot.mo.gov/forms/CO/Asbestos%20Survey%20Report%20-%20All%20Materials%20(Form%20T748).dot T748]. All contract proposals requiring asbestos abatement or demolition of buildings and bridges must include copies of these forms. Only the ACM listed on Form T748 will be tabulated for removal. The environmental specialist in the Design Diviison receives copies of all asbestos/painted concrete, block, and brick inspection forms for all &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;ten &lt;/del&gt;districts. These inspection forms are reviewed primarily to determine whether any painted concrete, block or brick surfaces exceed levels allowed for use as clean fill. The environmental specialist will notify the district personnel identified in the memo transmitting the results if there are areas identified in the structure that require disposal in a demolition or sanitary landfill. If a notification is not made, the painted concrete, block, and/or brick (if present) meets the definition of clean fill and can be managed as such, preferably on MoDOT right of way.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;It is important for the inspectors to have either a contact person in the district that is familiar with the properties or photographs of the buildings taken from the road so a positive identification can be made of each structure requiring inspection. Construction and Materials personnel will take samples of all suspected ACM and painted concrete and will report test results to the district on [http://epg.modot.mo.gov/forms/CO/Asbestos%20Survey%20Report%20-%20All%20Suspect%20ACM%20%20(Form%20T746).dot Forms T746], [http://epg.modot.mo.gov/forms/CO/Asbestos%20Survey%20Report%20-%20Nonfriable%20ACM%20(Form%20T747).dot T747], and [http://epg.modot.mo.gov/forms/CO/Asbestos%20Survey%20Report%20-%20All%20Materials%20(Form%20T748).dot T748]. All contract proposals requiring asbestos abatement or demolition of buildings and bridges must include copies of these forms. Only the ACM listed on Form T748 will be tabulated for removal. The environmental specialist in the Design Diviison receives copies of all asbestos/painted concrete, block, and brick inspection forms for all &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the &lt;/ins&gt;districts. These inspection forms are reviewed primarily to determine whether any painted concrete, block or brick surfaces exceed levels allowed for use as clean fill. The environmental specialist will notify the district personnel identified in the memo transmitting the results if there are areas identified in the structure that require disposal in a demolition or sanitary landfill. If a notification is not made, the painted concrete, block, and/or brick (if present) meets the definition of clean fill and can be managed as such, preferably on MoDOT right of way.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===Asbestos Containing Materials===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===Asbestos Containing Materials===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=28553&amp;oldid=prev</id>
		<title>Smithk: updated title</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=28553&amp;oldid=prev"/>
		<updated>2012-04-19T16:17:45Z</updated>

		<summary type="html">&lt;p&gt;updated title&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 11:17, 19 April 2012&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l29&quot;&gt;Line 29:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 29:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===Asbestos Containing Materials===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===Asbestos Containing Materials===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Asbestos removal must be completed prior to demolition of the building. ACM requiring removal will be listed on [http://epg.modot.mo.gov/forms/CO/Asbestos%20Survey%20Report%20-%20All%20Materials%20(Form%20T748).dot T748] for each parcel inspected. The contract proposal for asbestos removal should use [http://www.modot.mo.gov/business/contractor_resources/biditemslisting.htm standard bid items]. If all of the parcels have not been inspected for ACM, estimated quantities will be used. Check with a [http://wwwi/design/default.htm Design] &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;technical support engineer &lt;/del&gt;for assistance with this procedure. When quantities of ACM to be removed inside a single structure exceed 160 ft&amp;lt;sup&amp;gt;2&amp;lt;/sup&amp;gt; or 260 linear feet (80 m), third party air monitoring is required. The district project manager will coordinate with the environmental specialist to establish a memorandum of understanding with a certified industrial hygienist or equivalent to monitor the abatement, prior to commencement of the work.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Asbestos removal must be completed prior to demolition of the building. ACM requiring removal will be listed on [http://epg.modot.mo.gov/forms/CO/Asbestos%20Survey%20Report%20-%20All%20Materials%20(Form%20T748).dot T748] for each parcel inspected. The contract proposal for asbestos removal should use [http://www.modot.mo.gov/business/contractor_resources/biditemslisting.htm standard bid items]. If all of the parcels have not been inspected for ACM, estimated quantities will be used. Check with a [http://wwwi/design/default.htm Design] &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Liaison Engineer &lt;/ins&gt;for assistance with this procedure. When quantities of ACM to be removed inside a single structure exceed 160 ft&amp;lt;sup&amp;gt;2&amp;lt;/sup&amp;gt; or 260 linear feet (80 m), third party air monitoring is required. The district project manager will coordinate with the environmental specialist to establish a memorandum of understanding with a certified industrial hygienist or equivalent to monitor the abatement, prior to commencement of the work.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Once MoDOT has taken possession of a parcel, salvage of any materials or structures will not be permitted until an inspection for asbestos and hazardous waste has been made and all hazardous waste or ACM has been removed. The National Emission Standard for Hazardous Air Pollutants (NESHAP), asbestos regulations of the Environmental Protection Agency, and regulations of the Missouri Department of Natural Resources govern MoDOT operations. The project manager will ensure there is close coordination between the district staff concerning right-of-way acquisition, plan development, and contract administration for the removal of all improvements. The environmental specialist can assist with additional resources for hazardous waste screening, materials testing, and contract proposal preparation as needed.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Once MoDOT has taken possession of a parcel, salvage of any materials or structures will not be permitted until an inspection for asbestos and hazardous waste has been made and all hazardous waste or ACM has been removed. The National Emission Standard for Hazardous Air Pollutants (NESHAP), asbestos regulations of the Environmental Protection Agency, and regulations of the Missouri Department of Natural Resources govern MoDOT operations. The project manager will ensure there is close coordination between the district staff concerning right-of-way acquisition, plan development, and contract administration for the removal of all improvements. The environmental specialist can assist with additional resources for hazardous waste screening, materials testing, and contract proposal preparation as needed.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=23266&amp;oldid=prev</id>
		<title>Smithk: provided links to other EPG articles</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=23266&amp;oldid=prev"/>
		<updated>2010-06-23T18:02:14Z</updated>

		<summary type="html">&lt;p&gt;provided links to other EPG articles&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 13:02, 23 June 2010&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l1&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;{|border=&quot;4&quot; align=&quot;right&quot;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|-style=&quot;background:salmon&quot; &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|[[127.8 Hazardous and Solid Waste|&#039;&#039;&#039;Return to EPG 127.8 Hazardous and Solid Waste&#039;&#039;&#039;]]&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|-style=&quot;background:salmon&quot;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|[[236.5 Property Management|&#039;&#039;&#039;Return to EPG 236.5 Property Management&#039;&#039;&#039;]]&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|}&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;When parcels containing buildings, structures, wells, septic tanks, individual lagoons, or other improvements that may remain vacant or unattended for an extended time are acquired, it is necessary to let a contract for demolition and removal of improvements in advance of the general roadway contract. This is done to remove safety hazards, minimize liability and maintain an orderly right of way. Specifications governing this work are contained in [http://www.modot.mo.gov/business/standards_and_specs/Sec0202.pdf Section 202] of the Missouri Standard Specifications for Highway Construction. Demolition and removal activities are made most efficient by grouping together work from various projects within the district into a single contract.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;When parcels containing buildings, structures, wells, septic tanks, individual lagoons, or other improvements that may remain vacant or unattended for an extended time are acquired, it is necessary to let a contract for demolition and removal of improvements in advance of the general roadway contract. This is done to remove safety hazards, minimize liability and maintain an orderly right of way. Specifications governing this work are contained in [http://www.modot.mo.gov/business/standards_and_specs/Sec0202.pdf Section 202] of the Missouri Standard Specifications for Highway Construction. Demolition and removal activities are made most efficient by grouping together work from various projects within the district into a single contract.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[image:demolition.jpg|right|375px]]&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[image:demolition.jpg|right|375px]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=23259&amp;oldid=prev</id>
		<title>Smithk: /* Asbestos Containing Materials */ updated link</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=23259&amp;oldid=prev"/>
		<updated>2010-06-23T16:07:59Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;Asbestos Containing Materials: &lt;/span&gt; updated link&lt;/span&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 11:07, 23 June 2010&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l28&quot;&gt;Line 28:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 28:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The paragraph below contains language from a [[127.18 Job Special Provisions (JSP) and Contract Documents|JSP]] that pertains to notification requirements. The time frame for notification is to be included. Note that two, separate 10-day notifications are required, one for demolition and one for removal of ACM.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The paragraph below contains language from a [[127.18 Job Special Provisions (JSP) and Contract Documents|JSP]] that pertains to notification requirements. The time frame for notification is to be included. Note that two, separate 10-day notifications are required, one for demolition and one for removal of ACM.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The contractor shall complete the proper notification procedures in accordance with the appropriate federal, state, and local laws and regulations for demolition of buildings. The notification procedures and forms are available electronically at &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the following web site location: &lt;/del&gt;http://www.dnr&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;.state&lt;/del&gt;.mo.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;us&lt;/del&gt;/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;alpd/apcp&lt;/del&gt;/Asbestos&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;.htm &lt;/del&gt;or you may contact the MDNR’s Air Pollution Control Program at 1-800-361-4827. Notification is necessary at least 10 working days in advance of the start date for removal of asbestos or for the demolition of a building with or without reportable quantities of asbestos present. The contractor shall provide copies of all completed and approved forms to the engineer prior to any demolition work. Special attention should be given to the reporting requirements, since MoDOT can be easily cited for violation.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The contractor shall complete the proper notification procedures in accordance with the appropriate federal, state, and local laws and regulations for demolition of buildings. The notification procedures and forms are available electronically at &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;[&lt;/ins&gt;http://www.dnr.mo.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;gov&lt;/ins&gt;/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;forms&lt;/ins&gt;/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;index.html#AirPollution Asbestos NESHAP Notification of Demolition and Renovation, Form--MO 780-1923] (scroll down to this form under &quot;&lt;/ins&gt;Asbestos &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;(General)&quot;)  &lt;/ins&gt;or you may contact the MDNR’s Air Pollution Control Program at 1-800-361-4827. Notification is necessary at least 10 working days in advance of the start date for removal of asbestos or for the demolition of a building with or without reportable quantities of asbestos present. The contractor shall provide copies of all completed and approved forms to the engineer prior to any demolition work. Special attention should be given to the reporting requirements, since MoDOT can be easily cited for violation.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{| style=&amp;quot;margin: 1em auto 1em auto&amp;quot;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{| style=&amp;quot;margin: 1em auto 1em auto&amp;quot;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|-&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|-&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=21483&amp;oldid=prev</id>
		<title>Smithk: article construction</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=Demolition_and_Removal_of_Improvements&amp;diff=21483&amp;oldid=prev"/>
		<updated>2009-10-21T17:53:33Z</updated>

		<summary type="html">&lt;p&gt;article construction&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 12:53, 21 October 2009&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l1&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;When parcels containing buildings, structures, wells, septic tanks, individual lagoons, or other improvements that may remain vacant or unattended for an extended time are acquired, it is necessary to let a contract for demolition and removal of improvements in advance of the general roadway contract. This is done to remove safety hazards, minimize liability and maintain an orderly right of way. Specifications governing this work are contained in [http://www.modot.mo.gov/business/standards_and_specs/Sec0202.pdf Section 202] of the Missouri Standard Specifications for Highway Construction. Demolition and removal activities are made most efficient by grouping together work from various projects within the district into a single contract.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;When parcels containing buildings, structures, wells, septic tanks, individual lagoons, or other improvements that may remain vacant or unattended for an extended time are acquired, it is necessary to let a contract for demolition and removal of improvements in advance of the general roadway contract. This is done to remove safety hazards, minimize liability and maintain an orderly right of way. Specifications governing this work are contained in [http://www.modot.mo.gov/business/standards_and_specs/Sec0202.pdf Section 202] of the Missouri Standard Specifications for Highway Construction. Demolition and removal activities are made most efficient by grouping together work from various projects within the district into a single contract.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt; &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;[[image:demolition.jpg|right|375px]]&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The quantities in the proposal need to be tabulated by parcel for each roadway project on the program. It is recommended the district anticipate those parcels that will be acquired within a 12-month period throughout the district and include them in one contract for demolition and removal of improvements. [http://www3.modot.mo.gov/jobspec2.nsf/40d8d12ad121cf2f862567bb004c65ce/aef6cefb61927a3686256a53006449ee?OpenDocument Job Special Provision DSP-99-08D, Demolition and Removal Contract], must be included in demolition and removal contracts when MoDOT does not have possession of all parcels or an asbestos/painted concrete, block and brick inspection has not been completed on all structures prior to letting.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The quantities in the proposal need to be tabulated by parcel for each roadway project on the program. It is recommended the district anticipate those parcels that will be acquired within a 12-month period throughout the district and include them in one contract for demolition and removal of improvements. [http://www3.modot.mo.gov/jobspec2.nsf/40d8d12ad121cf2f862567bb004c65ce/aef6cefb61927a3686256a53006449ee?OpenDocument Job Special Provision DSP-99-08D, Demolition and Removal Contract], must be included in demolition and removal contracts when MoDOT does not have possession of all parcels or an asbestos/painted concrete, block and brick inspection has not been completed on all structures prior to letting.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
</feed>