<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://epgtest3.modot.org/index.php?action=history&amp;feed=atom&amp;title=903.21_Construction_Inspection_Guidelines_for_Sec_903</id>
	<title>903.21 Construction Inspection Guidelines for Sec 903 - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://epgtest3.modot.org/index.php?action=history&amp;feed=atom&amp;title=903.21_Construction_Inspection_Guidelines_for_Sec_903"/>
	<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;action=history"/>
	<updated>2026-04-29T15:57:05Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.42.3</generator>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=49309&amp;oldid=prev</id>
		<title>Smithk: Per TS, minor updates</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=49309&amp;oldid=prev"/>
		<updated>2021-04-27T14:52:52Z</updated>

		<summary type="html">&lt;p&gt;Per TS, minor updates&lt;/p&gt;
&lt;a href=&quot;https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;amp;diff=49309&amp;amp;oldid=49307&quot;&gt;Show changes&lt;/a&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=49307&amp;oldid=prev</id>
		<title>Smithk: Smithk moved page 903.22 Construction Inspection Guidelines for Sec 903 to 903.21 Construction Inspection Guidelines for Sec 903: This article and subsequent EPG 903 articles (EPG 903.15 - EPG 903.24) were renumbered (became EPG 903.14 - 903.23) when TS deleted EPG 903.14 Emergency Management Signing))</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=49307&amp;oldid=prev"/>
		<updated>2021-04-27T14:49:24Z</updated>

		<summary type="html">&lt;p&gt;Smithk moved page &lt;a href=&quot;/index.php?title=903.22_Construction_Inspection_Guidelines_for_Sec_903&quot; class=&quot;mw-redirect&quot; title=&quot;903.22 Construction Inspection Guidelines for Sec 903&quot;&gt;903.22 Construction Inspection Guidelines for Sec 903&lt;/a&gt; to &lt;a href=&quot;/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&quot; title=&quot;903.21 Construction Inspection Guidelines for Sec 903&quot;&gt;903.21 Construction Inspection Guidelines for Sec 903&lt;/a&gt;: This article and subsequent EPG 903 articles (EPG 903.15 - EPG 903.24) were renumbered (became EPG 903.14 - 903.23) when TS deleted EPG 903.14 Emergency Management Signing))&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;1&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;1&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 09:49, 27 April 2021&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-notice&quot; lang=&quot;en&quot;&gt;&lt;div class=&quot;mw-diff-empty&quot;&gt;(No difference)&lt;/div&gt;
&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=44195&amp;oldid=prev</id>
		<title>Smithk at 15:06, 31 October 2018</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=44195&amp;oldid=prev"/>
		<updated>2018-10-31T15:06:45Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 10:06, 31 October 2018&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l27&quot;&gt;Line 27:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 27:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==Base Construction Inspection (for Sec 903.3)==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==Base Construction Inspection (for Sec 903.3)==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Excavating, forming, pouring and curing of concrete sign bases will be done in accordance with contract requirements.  Inspection of these operations is similar to procedures set out in &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;[http://www.modot.mo.gov/business/standards_and_specs/DIV0700.pdf &lt;/del&gt;Division 700&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;] &lt;/del&gt;for structures.  Galvanized signposts are not to be stored on the ground.  Storage on the ground for lengthy periods results in stained and unsightly posts.  Forewarn the contractor that there is practically no margin for error in setting the post since the safety program requires the breakaway feature to be properly located and the sign base to be flush with ground line. The inspector should check welds on cover plates and base plates of bolt-down posts for rust spots.  These and other small areas where galvanizing has been chipped off due to rough handling should be cleaned and repaired.  If a post shows considerable rust along welds, reject the post.  The area around washers and bolts on breakaway features is to be free of beads and runs so a true value is obtained for torque requirements.  The contractor should provide suitable bracing for each post set in concrete to ensure it will remain plumb during the concrete placement and curing period.  The contractor is required to clean concrete from the post immediately after placement is finished.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Excavating, forming, pouring and curing of concrete sign bases will be done in accordance with contract requirements.  Inspection of these operations is similar to procedures set out in Division 700 &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;of the &#039;&#039;Missouri Standard Specifications for Highway Construction&#039;&#039; &lt;/ins&gt;for structures.  Galvanized signposts are not to be stored on the ground.  Storage on the ground for lengthy periods results in stained and unsightly posts.  Forewarn the contractor that there is practically no margin for error in setting the post since the safety program requires the breakaway feature to be properly located and the sign base to be flush with ground line. The inspector should check welds on cover plates and base plates of bolt-down posts for rust spots.  These and other small areas where galvanizing has been chipped off due to rough handling should be cleaned and repaired.  If a post shows considerable rust along welds, reject the post.  The area around washers and bolts on breakaway features is to be free of beads and runs so a true value is obtained for torque requirements.  The contractor should provide suitable bracing for each post set in concrete to ensure it will remain plumb during the concrete placement and curing period.  The contractor is required to clean concrete from the post immediately after placement is finished.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==Sign Inspection==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==Sign Inspection==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l60&quot;&gt;Line 60:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 60:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:(3) Check for possible conflicts with overhead power transmission lines.  Refer to [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=13 Sec 901.1].    &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:(3) Check for possible conflicts with overhead power transmission lines.  Refer to [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=13 Sec 901.1].    &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Staking, excavating, forming and concreting of truss footings and pedestals are similar to operations performed when building a bridge footing.  Inspection procedure should follow, in general, instructions set out in &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;[http://www.modot.mo.gov/business/standards_and_specs/DIV0700.pdf &lt;/del&gt;Division 700&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;]&lt;/del&gt;.  In addition, conduit run through the truss pedestal is to be properly capped to prevent concrete from entering during placement.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Staking, excavating, forming and concreting of truss footings and pedestals are similar to operations performed when building a bridge footing.  Inspection procedure should follow, in general, instructions set out in Division 700 &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;of the &#039;&#039;Missouri Standard Specifications for Highway Construction&#039;&#039;&lt;/ins&gt;.  In addition, conduit run through the truss pedestal is to be properly capped to prevent concrete from entering during placement.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;When truss erection is done after the roadway is opened to traffic, the inspector will make certain the contractor takes necessary measures to ensure traffic protection.  If traffic will have to be stopped for truss erection, the inspector is to require the contractor to have all pre-erection column adjustments made in advance.  The contractor should have all necessary workers and erection materials at hand before traffic is stopped so the least possible delay occurs.  The inspector should instruct the contractor to adjust the columns for the overhead truss to the proper spacing by use of the leveling nuts.  Proper spacing depends on the material from which the truss is fabricated and the temperature of the truss material at time of erection.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;When truss erection is done after the roadway is opened to traffic, the inspector will make certain the contractor takes necessary measures to ensure traffic protection.  If traffic will have to be stopped for truss erection, the inspector is to require the contractor to have all pre-erection column adjustments made in advance.  The contractor should have all necessary workers and erection materials at hand before traffic is stopped so the least possible delay occurs.  The inspector should instruct the contractor to adjust the columns for the overhead truss to the proper spacing by use of the leveling nuts.  Proper spacing depends on the material from which the truss is fabricated and the temperature of the truss material at time of erection.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=43705&amp;oldid=prev</id>
		<title>Smithk at 13:18, 21 September 2018</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=43705&amp;oldid=prev"/>
		<updated>2018-09-21T13:18:53Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 08:18, 21 September 2018&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l21&quot;&gt;Line 21:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 21:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After sign locations have been correctly established, final staking may be done.  The time of this staking depends upon whether signing is a separate project or is included in a general contract.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After sign locations have been correctly established, final staking may be done.  The time of this staking depends upon whether signing is a separate project or is included in a general contract.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Skew angle, shown on [&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;http&lt;/del&gt;://www.modot.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;mo.gov/business/standards_and_specs&lt;/del&gt;/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;documents&lt;/del&gt;/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;90303.pdf &lt;/del&gt; Standard Plan 903.03] for 2- and 3-post signs, is very important in the erection of shoulder mount signs.  If a sign is erected without proper skew angle, the sign will reflect too much light from vehicle headlights and sign copy will be unreadable due to glare.  The skew angle may be increased to give better nighttime readability when the panel is located on the inside of a short radius curve.  It is also good practice to skew all single-post, shoulder mount signs in the same manner.  Exceptions are “Stop” sign panels and structural signs located 30 ft. from edge of pavement.  These signs are normally more effective if they directly face approaching traffic.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Skew angle, shown on [&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;https&lt;/ins&gt;://www.modot.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;org&lt;/ins&gt;/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;media&lt;/ins&gt;/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;16921 &lt;/ins&gt; Standard Plan 903.03] for 2- and 3-post signs, is very important in the erection of shoulder mount signs.  If a sign is erected without proper skew angle, the sign will reflect too much light from vehicle headlights and sign copy will be unreadable due to glare.  The skew angle may be increased to give better nighttime readability when the panel is located on the inside of a short radius curve.  It is also good practice to skew all single-post, shoulder mount signs in the same manner.  Exceptions are “Stop” sign panels and structural signs located 30 ft. from edge of pavement.  These signs are normally more effective if they directly face approaching traffic.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The number of stakes required to provide line and grade for sign footings varies, depending upon type of footing and the number of footings required for a particular sign.  It is not intended to set out an exact procedure and number of stakes to be employed for any particular footing.  Enough “red heads”, “tacked hubs” and grade stakes should be provided so the contractor will be able to establish correct line and grade using tools of the carpenter’s trade.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The number of stakes required to provide line and grade for sign footings varies, depending upon type of footing and the number of footings required for a particular sign.  It is not intended to set out an exact procedure and number of stakes to be employed for any particular footing.  Enough “red heads”, “tacked hubs” and grade stakes should be provided so the contractor will be able to establish correct line and grade using tools of the carpenter’s trade.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=37738&amp;oldid=prev</id>
		<title>Smithk: updated links</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=37738&amp;oldid=prev"/>
		<updated>2016-06-15T15:04:05Z</updated>

		<summary type="html">&lt;p&gt;updated links&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 10:04, 15 June 2016&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l1&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[image:903.20 KC skyline.jpg|left|475px]]&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[image:903.20 KC skyline.jpg|left|475px]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==General ([http://www.modot.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;mo.gov&lt;/del&gt;/business/standards_and_specs/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Sec0903&lt;/del&gt;.pdf for Sec 903.1])==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==General ([http://www.modot.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;org&lt;/ins&gt;/business/standards_and_specs/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;SpecbookEPG&lt;/ins&gt;.pdf&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;#page=13 &lt;/ins&gt;for Sec 903.1])==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Responsibility for erection of signing and route marking on interstate and certain primary routes has been assigned to Construction &amp;amp; Materials.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Responsibility for erection of signing and route marking on interstate and certain primary routes has been assigned to Construction &amp;amp; Materials.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l7&quot;&gt;Line 7:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 7:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Changes in standards and specifications have been rapid and numerous.  Due to these changes, it is essential that all personnel assigned to inspection of signing projects, regardless of previous signing experience, make a detailed study of the plans, specifications and proposal before work commences.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Changes in standards and specifications have been rapid and numerous.  Due to these changes, it is essential that all personnel assigned to inspection of signing projects, regardless of previous signing experience, make a detailed study of the plans, specifications and proposal before work commences.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The list of equipment and materials contained in proposals for erection of signs is to be submitted by the contractor soon after award of the contract.  The list serves a purpose similar to that outlined in [http://www.modot.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;mo.gov&lt;/del&gt;/business/standards_and_specs/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Sec0901&lt;/del&gt;.pdf Sec 901].     &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The list of equipment and materials contained in proposals for erection of signs is to be submitted by the contractor soon after award of the contract.  The list serves a purpose similar to that outlined in [http://www.modot.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;org&lt;/ins&gt;/business/standards_and_specs/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;SpecbookEPG&lt;/ins&gt;.pdf&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;#page=13 &lt;/ins&gt;Sec 901].     &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==Staking==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==Staking==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l58&quot;&gt;Line 58:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 58:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:(2) Maintain a minimum of 2 ft. of backfill over the entire truss footings.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:(2) Maintain a minimum of 2 ft. of backfill over the entire truss footings.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:(3) Check for possible conflicts with overhead power transmission lines.  Refer to [http://www.modot.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;mo.gov&lt;/del&gt;/business/standards_and_specs/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Sec0901&lt;/del&gt;.pdf Sec 901.1].    &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:(3) Check for possible conflicts with overhead power transmission lines.  Refer to [http://www.modot.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;org&lt;/ins&gt;/business/standards_and_specs/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;SpecbookEPG&lt;/ins&gt;.pdf&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;#page=13 &lt;/ins&gt;Sec 901.1].    &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Staking, excavating, forming and concreting of truss footings and pedestals are similar to operations performed when building a bridge footing.  Inspection procedure should follow, in general, instructions set out in [http://www.modot.mo.gov/business/standards_and_specs/DIV0700.pdf Division 700].  In addition, conduit run through the truss pedestal is to be properly capped to prevent concrete from entering during placement.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Staking, excavating, forming and concreting of truss footings and pedestals are similar to operations performed when building a bridge footing.  Inspection procedure should follow, in general, instructions set out in [http://www.modot.mo.gov/business/standards_and_specs/DIV0700.pdf Division 700].  In addition, conduit run through the truss pedestal is to be properly capped to prevent concrete from entering during placement.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=27325&amp;oldid=prev</id>
		<title>Smithk: Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD.</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=27325&amp;oldid=prev"/>
		<updated>2012-01-17T16:50:12Z</updated>

		<summary type="html">&lt;p&gt;Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD.&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 11:50, 17 January 2012&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l15&quot;&gt;Line 15:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 15:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Plan location of a sign is only approximate. The inspector is to check each plan location to determine that sight distance is ample, the sign will not conflict with any roadway or bridge feature and is positioned so that it will not be splattered by snow and ice removal from a nearby overhead bridge.  Also, if highway lighting is to be installed, carefully check to see that a pole or group of poles will not obscure sign face copy.  Avoid locating a large shoulder mount sign directly behind a lighting pole.  A light near a sign face will cause glare on a portion of the face and lessen its effectiveness.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Plan location of a sign is only approximate. The inspector is to check each plan location to determine that sight distance is ample, the sign will not conflict with any roadway or bridge feature and is positioned so that it will not be splattered by snow and ice removal from a nearby overhead bridge.  Also, if highway lighting is to be installed, carefully check to see that a pole or group of poles will not obscure sign face copy.  Avoid locating a large shoulder mount sign directly behind a lighting pole.  A light near a sign face will cause glare on a portion of the face and lessen its effectiveness.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After preliminary staking is completed, the entire signing project should be checked with the help of district traffic personnel.  A general rule to follow in checking a sign location is that there should be an unobstructed view of the sign face for a distance of 50 ft. per in. of letter height for the silkscreen type of sign, and 60 ft. per in. of letter height for a reflectorized sign using cutout letters.  This ideal distance cannot be obtained in every case due to geometrics of certain interchanges, addition of lighting, number of signs involved in a particular area and many other factors.  However, an effort should be made to adjust signs to obtain the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;above &lt;/del&gt;sight distances whenever possible.  Avoid shifting a sign to a location where its effectiveness is lost or its message can be misunderstood.  Whenever possible, signs should be located behind guardrail installed for other purposes.  When this can be done, there is no need for a breakaway feature on the post.  Another point to be checked is the possibility of offsetting structural signs 30 ft. from edge of pavement.  This offset will also eliminate the need for the breakaway feature.  &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Even though &lt;/del&gt;a structural sign cannot be offset 30 ft. from edge of pavement&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;, it is desirable to offset it as far as possible for added safety&lt;/del&gt;.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After preliminary staking is completed, the entire signing project should be checked with the help of district traffic personnel.  A general rule to follow in checking a sign location is that there should be an unobstructed view of the sign face for a distance of 50 ft. per in. of letter height for the silkscreen type of sign, and 60 ft. per in. of letter height for a reflectorized sign using cutout letters.  This ideal distance cannot be obtained in every case due to geometrics of certain interchanges, addition of lighting, number of signs involved in a particular area and many other factors.  However, an effort should be made to adjust signs to obtain the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;appropriate &lt;/ins&gt;sight distances whenever possible.  Avoid shifting a sign to a location where its effectiveness is lost or its message can be misunderstood.  Whenever possible, signs should be located behind guardrail installed for other purposes.  When this can be done, there is no need for a breakaway feature on the post.  Another point to be checked is the possibility of offsetting structural signs 30 ft. from edge of pavement.  This offset will also eliminate the need for the breakaway feature.  &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;It is desirable to offset &lt;/ins&gt;a structural sign &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;as far as possible for added safety, even though it &lt;/ins&gt;cannot be offset 30 ft. from edge of pavement. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;To determine if proper sight distance will be available, place range poles or laths at horizontal limits of the sign.  An observer facing the sign location at the proper distance and in the approximate plane of an approaching driver may readily determine any conflicts.  Any necessary adjustments in sign location can then be made.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;To determine if proper sight distance will be available, place range poles or laths at horizontal limits of the sign.  An observer facing the sign location at the proper distance and in the approximate plane of an approaching driver may readily determine any conflicts.  Any necessary adjustments in sign location can then be made.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l58&quot;&gt;Line 58:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 58:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:(2) Maintain a minimum of 2 ft. of backfill over the entire truss footings.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:(2) Maintain a minimum of 2 ft. of backfill over the entire truss footings.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:(3&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;) Where highway lighting is to be installed in conjunction with signing work or is to be let at a later date, take care to avoid locating a mercury vapor luminaire closer than 50 ft. ahead or behind the truss.  This is to prevent the luminaire from reflecting light from the sign face into the motorist’s eyes when located in front of the truss. &lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:(3) Check for possible conflicts with overhead power transmission lines.  Refer to [http://www.modot.mo.gov/business/standards_and_specs/Sec0901.pdf Sec 901.1].    &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt; &lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;:(4&lt;/del&gt;) Check for possible conflicts with overhead power transmission lines.  Refer to [http://www.modot.mo.gov/business/standards_and_specs/Sec0901.pdf Sec 901.1].    &lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Staking, excavating, forming and concreting of truss footings and pedestals are similar to operations performed when building a bridge footing.  Inspection procedure should follow, in general, instructions set out in [http://www.modot.mo.gov/business/standards_and_specs/DIV0700.pdf Division 700].  In addition, conduit run through the truss pedestal is to be properly capped to prevent concrete from entering during placement.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Staking, excavating, forming and concreting of truss footings and pedestals are similar to operations performed when building a bridge footing.  Inspection procedure should follow, in general, instructions set out in [http://www.modot.mo.gov/business/standards_and_specs/DIV0700.pdf Division 700].  In addition, conduit run through the truss pedestal is to be properly capped to prevent concrete from entering during placement.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l70&quot;&gt;Line 70:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 68:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:Using a coefficient of expansion for steel of 0.0000065 per degree Fahrenheit, the correction would be:&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:Using a coefficient of expansion for steel of 0.0000065 per degree Fahrenheit, the correction would be:&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:: (110º -55º) x 75 x 0.0000065 = 0.027 ft. = 5/16 in.   &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:: (110º - 55º) x 75 x 0.0000065 = 0.027 ft. = 5/16 in.   &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Each space, nearest to the roadway, between the collar and the column should be reduced by 5/32 in.  If the same length truss is aluminum, the coefficient of expansion for aluminum is 0.000013 per degree Fahrenheit and the correction would be:&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Each space, nearest to the roadway, between the collar and the column should be reduced by 5/32 in.  If the same length truss is aluminum, the coefficient of expansion for aluminum is 0.000013 per degree Fahrenheit and the correction would be:&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;::(110º-55º) x 75 x 0.000013 = 0.054 ft. = 5/8 in.   &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;::(110º - 55º) x 75 x 0.000013 = 0.054 ft. = 5/8 in.   &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Each space, nearest the roadway, between column and collar should then be reduced by 5/16 in.  Conversely, if metal temperature is below 55º F, column tops should be adjusted to increase the space by the amount calculated.  The foregoing calculations were made on the assumption that the truss columns were spaced plan distance apart and that the truss was fabricated to plan length.  Any variation from plan in either case will have to be taken into consideration and adjustments made accordingly.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Each space, nearest the roadway, between column and collar should then be reduced by 5/16 in.  Conversely, if metal temperature is below 55º F, column tops should be adjusted to increase the space by the amount calculated.  The foregoing calculations were made on the assumption that the truss columns were spaced plan distance apart and that the truss was fabricated to plan length.  Any variation from plan in either case will have to be taken into consideration and adjustments made accordingly.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l80&quot;&gt;Line 80:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 78:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The foregoing instructions are given with the knowledge that most overhead trusses, over a period of time, gradually shift left or right and finally bear against the collar.  This is probably due to traffic vibration and to unequal coefficients of friction between column and truss bearing areas.  However, it is essential to set the truss on the columns with proper spacing, based on temperature, between each column and its respective collar during initial erection.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The foregoing instructions are given with the knowledge that most overhead trusses, over a period of time, gradually shift left or right and finally bear against the collar.  This is probably due to traffic vibration and to unequal coefficients of friction between column and truss bearing areas.  However, it is essential to set the truss on the columns with proper spacing, based on temperature, between each column and its respective collar during initial erection.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;==Truss Lighting Systems==&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Sign lighting placed on overhead trusses usually consists of a series of Mercury Vapor or Metal Halide luminaires wired in parallel and mounted forward of the catwalk.  Their placement angle or angle of longitudinal tilt should be such that sign face area is equally illuminated at all points.  Inspect each fixture for shipment damage and to ensure that proper bulbs and ballasts are installed.  Each fixture is to be wired to the No. 10 gauge power supply cables by use of tap splices and short lengths of No. 14 THW or THHW insulated wire, rather than by wiring power supply cables to the terminal in each fixture.  &lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Test cable-conduit between the power source and truss switch box in accordance with [http://www.modot.mo.gov/business/standards_and_specs/Sec0901.pdf Sec 901.4].  This is particularly important where the truss circuit is to be wired to an existing mercury vapor lighting circuit or to a mercury vapor lighting circuit that is to be placed by another contractor.  If truss circuits are checked in advance of final connections, the inspector can be reasonably sure that if trouble develops on the mercury vapor circuit, the sign lighting circuit will not be the cause.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[Category:903 Highway Signing]]&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[Category:903 Highway Signing]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=27323&amp;oldid=prev</id>
		<title>Smithk: 903.20 Construction Inspection Guidelines for Sec 903 moved to 903.22 Construction Inspection Guidelines for Sec 903: Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD.</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=27323&amp;oldid=prev"/>
		<updated>2012-01-17T16:49:03Z</updated>

		<summary type="html">&lt;p&gt;&lt;a href=&quot;/index.php?title=903.20_Construction_Inspection_Guidelines_for_Sec_903&quot; class=&quot;mw-redirect&quot; title=&quot;903.20 Construction Inspection Guidelines for Sec 903&quot;&gt;903.20 Construction Inspection Guidelines for Sec 903&lt;/a&gt; moved to &lt;a href=&quot;/index.php?title=903.22_Construction_Inspection_Guidelines_for_Sec_903&quot; class=&quot;mw-redirect&quot; title=&quot;903.22 Construction Inspection Guidelines for Sec 903&quot;&gt;903.22 Construction Inspection Guidelines for Sec 903&lt;/a&gt;: Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD.&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;1&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;1&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 11:49, 17 January 2012&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-notice&quot; lang=&quot;en&quot;&gt;&lt;div class=&quot;mw-diff-empty&quot;&gt;(No difference)&lt;/div&gt;
&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=26468&amp;oldid=prev</id>
		<title>Smithk: /* Sign Inspection */ removed photo</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=26468&amp;oldid=prev"/>
		<updated>2011-09-01T14:54:17Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;Sign Inspection: &lt;/span&gt; removed photo&lt;/span&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 09:54, 1 September 2011&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l30&quot;&gt;Line 30:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 30:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==Sign Inspection==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==Sign Inspection==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;[[image:903.20 inspector.jpg|right|150px|thumb|&amp;lt;center&amp;gt;&#039;&#039;&#039;An inspector&#039;&#039;&#039;&amp;lt;/center&amp;gt;]]&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The inspector is to make a careful inspection of signs when they arrive on the project site.  Some contractors store signs on the project for a considerable time before erection.  Other contractors prefer to have all posts erected before ordering signs shipped from the fabricating plant.  If signs are to be stored, the inspector is to insist that the signs be stored so air can circulate around sign faces and so they are not in contact with the ground or vegetation.  When signs are unpacked, carefully inspect each sign for damage incurred in packaging or in transit and for errors in copy.  Make spot checks of letter and numeral height and spacing using the original plan drawings as a guide.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The inspector is to make a careful inspection of signs when they arrive on the project site.  Some contractors store signs on the project for a considerable time before erection.  Other contractors prefer to have all posts erected before ordering signs shipped from the fabricating plant.  If signs are to be stored, the inspector is to insist that the signs be stored so air can circulate around sign faces and so they are not in contact with the ground or vegetation.  When signs are unpacked, carefully inspect each sign for damage incurred in packaging or in transit and for errors in copy.  Make spot checks of letter and numeral height and spacing using the original plan drawings as a guide.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=24243&amp;oldid=prev</id>
		<title>Smithk: /* Sign Inspection */Per Traffic and CM, &quot;Light poles are not to be used to mount signs&quot; was added for emphasis.</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=24243&amp;oldid=prev"/>
		<updated>2010-08-30T15:03:56Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;Sign Inspection: &lt;/span&gt;Per Traffic and CM, &amp;quot;Light poles are not to be used to mount signs&amp;quot; was added for emphasis.&lt;/span&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 10:03, 30 August 2010&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l42&quot;&gt;Line 42:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 42:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Each cutout letter, numeral, arrow or border is to have enough rivets to hold the reflectors securely in place.  If reflector buttons slip or become misplaced during sign erection, the inspector should require additional rivets to be placed in strategic locations to secure all reflectors in a letter, figure or symbol.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Each cutout letter, numeral, arrow or border is to have enough rivets to hold the reflectors securely in place.  If reflector buttons slip or become misplaced during sign erection, the inspector should require additional rivets to be placed in strategic locations to secure all reflectors in a letter, figure or symbol.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Light poles are not to be used to mount signs.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Night inspections as well as daytime inspections should be made of all signs, delineators and mileposts.  Make night inspections to check reflectivity of reflectorized sheeting, reflectors in cutout letters and delineators.  Remember that dew and frost collection on signs that have reflective sheeting tends to lessen the desired effect of the signs.  Inspections should be made before dew or frost collects to properly evaluate effectiveness of signing.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Night inspections as well as daytime inspections should be made of all signs, delineators and mileposts.  Make night inspections to check reflectivity of reflectorized sheeting, reflectors in cutout letters and delineators.  Remember that dew and frost collection on signs that have reflective sheeting tends to lessen the desired effect of the signs.  Inspections should be made before dew or frost collects to properly evaluate effectiveness of signing.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=23754&amp;oldid=prev</id>
		<title>Smithk: &quot;ensure&quot; correction</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=903.21_Construction_Inspection_Guidelines_for_Sec_903&amp;diff=23754&amp;oldid=prev"/>
		<updated>2010-07-09T13:00:58Z</updated>

		<summary type="html">&lt;p&gt;&amp;quot;ensure&amp;quot; correction&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 08:00, 9 July 2010&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l27&quot;&gt;Line 27:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 27:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==Base Construction Inspection (for Sec 903.3)==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==Base Construction Inspection (for Sec 903.3)==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Excavating, forming, pouring and curing of concrete sign bases will be done in accordance with contract requirements.  Inspection of these operations is similar to procedures set out in [http://www.modot.mo.gov/business/standards_and_specs/DIV0700.pdf Division 700] for structures.  Galvanized signposts are not to be stored on the ground.  Storage on the ground for lengthy periods results in stained and unsightly posts.  Forewarn the contractor that there is practically no margin for error in setting the post since the safety program requires the breakaway feature to be properly located and the sign base to be flush with ground line. The inspector should check welds on cover plates and base plates of bolt-down posts for rust spots.  These and other small areas where galvanizing has been chipped off due to rough handling should be cleaned and repaired.  If a post shows considerable rust along welds, reject the post.  The area around washers and bolts on breakaway features is to be free of beads and runs so a true value is obtained for torque requirements.  The contractor should provide suitable bracing for each post set in concrete to &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;insure &lt;/del&gt;it will remain plumb during the concrete placement and curing period.  The contractor is required to clean concrete from the post immediately after placement is finished.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Excavating, forming, pouring and curing of concrete sign bases will be done in accordance with contract requirements.  Inspection of these operations is similar to procedures set out in [http://www.modot.mo.gov/business/standards_and_specs/DIV0700.pdf Division 700] for structures.  Galvanized signposts are not to be stored on the ground.  Storage on the ground for lengthy periods results in stained and unsightly posts.  Forewarn the contractor that there is practically no margin for error in setting the post since the safety program requires the breakaway feature to be properly located and the sign base to be flush with ground line. The inspector should check welds on cover plates and base plates of bolt-down posts for rust spots.  These and other small areas where galvanizing has been chipped off due to rough handling should be cleaned and repaired.  If a post shows considerable rust along welds, reject the post.  The area around washers and bolts on breakaway features is to be free of beads and runs so a true value is obtained for torque requirements.  The contractor should provide suitable bracing for each post set in concrete to &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;ensure &lt;/ins&gt;it will remain plumb during the concrete placement and curing period.  The contractor is required to clean concrete from the post immediately after placement is finished.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==Sign Inspection==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==Sign Inspection==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l63&quot;&gt;Line 63:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 63:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Staking, excavating, forming and concreting of truss footings and pedestals are similar to operations performed when building a bridge footing.  Inspection procedure should follow, in general, instructions set out in [http://www.modot.mo.gov/business/standards_and_specs/DIV0700.pdf Division 700].  In addition, conduit run through the truss pedestal is to be properly capped to prevent concrete from entering during placement.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Staking, excavating, forming and concreting of truss footings and pedestals are similar to operations performed when building a bridge footing.  Inspection procedure should follow, in general, instructions set out in [http://www.modot.mo.gov/business/standards_and_specs/DIV0700.pdf Division 700].  In addition, conduit run through the truss pedestal is to be properly capped to prevent concrete from entering during placement.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;When truss erection is done after the roadway is opened to traffic, the inspector will make certain the contractor takes necessary measures to &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;insure &lt;/del&gt;traffic protection.  If traffic will have to be stopped for truss erection, the inspector is to require the contractor to have all pre-erection column adjustments made in advance.  The contractor should have all necessary workers and erection materials at hand before traffic is stopped so the least possible delay occurs.  The inspector should instruct the contractor to adjust the columns for the overhead truss to the proper spacing by use of the leveling nuts.  Proper spacing depends on the material from which the truss is fabricated and the temperature of the truss material at time of erection.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;When truss erection is done after the roadway is opened to traffic, the inspector will make certain the contractor takes necessary measures to &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;ensure &lt;/ins&gt;traffic protection.  If traffic will have to be stopped for truss erection, the inspector is to require the contractor to have all pre-erection column adjustments made in advance.  The contractor should have all necessary workers and erection materials at hand before traffic is stopped so the least possible delay occurs.  The inspector should instruct the contractor to adjust the columns for the overhead truss to the proper spacing by use of the leveling nuts.  Proper spacing depends on the material from which the truss is fabricated and the temperature of the truss material at time of erection.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Plans for both aluminum and steel overhead trusses generally show one in. of collar space on each side of the column at a temperature of 55º F.  A temperature correction should be made by adjustment of the base leveling nuts. For example, if a 75 ft. steel truss is to be erected at a metal temperature of 110º F, the following calculations are to be made:   &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Plans for both aluminum and steel overhead trusses generally show one in. of collar space on each side of the column at a temperature of 55º F.  A temperature correction should be made by adjustment of the base leveling nuts. For example, if a 75 ft. steel truss is to be erected at a metal temperature of 110º F, the following calculations are to be made:   &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l81&quot;&gt;Line 81:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 81:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==Truss Lighting Systems==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==Truss Lighting Systems==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Sign lighting placed on overhead trusses usually consists of a series of Mercury Vapor or Metal Halide luminaires wired in parallel and mounted forward of the catwalk.  Their placement angle or angle of longitudinal tilt should be such that sign face area is equally illuminated at all points.  Inspect each fixture for shipment damage and to &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;insure &lt;/del&gt;that proper bulbs and ballasts are installed.  Each fixture is to be wired to the No. 10 gauge power supply cables by use of tap splices and short lengths of No. 14 THW or THHW insulated wire, rather than by wiring power supply cables to the terminal in each fixture.   &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Sign lighting placed on overhead trusses usually consists of a series of Mercury Vapor or Metal Halide luminaires wired in parallel and mounted forward of the catwalk.  Their placement angle or angle of longitudinal tilt should be such that sign face area is equally illuminated at all points.  Inspect each fixture for shipment damage and to &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;ensure &lt;/ins&gt;that proper bulbs and ballasts are installed.  Each fixture is to be wired to the No. 10 gauge power supply cables by use of tap splices and short lengths of No. 14 THW or THHW insulated wire, rather than by wiring power supply cables to the terminal in each fixture.   &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Test cable-conduit between the power source and truss switch box in accordance with [http://www.modot.mo.gov/business/standards_and_specs/Sec0901.pdf Sec 901.4].  This is particularly important where the truss circuit is to be wired to an existing mercury vapor lighting circuit or to a mercury vapor lighting circuit that is to be placed by another contractor.  If truss circuits are checked in advance of final connections, the inspector can be reasonably sure that if trouble develops on the mercury vapor circuit, the sign lighting circuit will not be the cause.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Test cable-conduit between the power source and truss switch box in accordance with [http://www.modot.mo.gov/business/standards_and_specs/Sec0901.pdf Sec 901.4].  This is particularly important where the truss circuit is to be wired to an existing mercury vapor lighting circuit or to a mercury vapor lighting circuit that is to be placed by another contractor.  If truss circuits are checked in advance of final connections, the inspector can be reasonably sure that if trouble develops on the mercury vapor circuit, the sign lighting circuit will not be the cause.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
</feed>