<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://epgtest3.modot.org/index.php?action=history&amp;feed=atom&amp;title=136.2_Bridge_Soft_Match_Credit_Program</id>
	<title>136.2 Bridge Soft Match Credit Program - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://epgtest3.modot.org/index.php?action=history&amp;feed=atom&amp;title=136.2_Bridge_Soft_Match_Credit_Program"/>
	<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;action=history"/>
	<updated>2026-04-29T10:29:57Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.42.3</generator>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;diff=28569&amp;oldid=prev</id>
		<title>Smithk: Per Design, EPG 136 was generally re-written following thorough research and input from LPAs, consultants and FHWA.</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;diff=28569&amp;oldid=prev"/>
		<updated>2012-04-23T17:20:59Z</updated>

		<summary type="html">&lt;p&gt;Per Design, EPG 136 was generally re-written following thorough research and input from LPAs, consultants and FHWA.&lt;/p&gt;
&lt;a href=&quot;https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;amp;diff=28569&amp;amp;oldid=25007&quot;&gt;Show changes&lt;/a&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;diff=25007&amp;oldid=prev</id>
		<title>Smithk: Per LPA Coord, FHWA and MoDOT sr mng&#039;t: new checklist, new certification by engr of record and a new assumption that if rehab costs are 68% or more of replacement costs, the replacem&#039;t is better value</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;diff=25007&amp;oldid=prev"/>
		<updated>2011-01-13T16:01:46Z</updated>

		<summary type="html">&lt;p&gt;Per LPA Coord, FHWA and MoDOT sr mng&amp;#039;t: new checklist, new certification by engr of record and a new assumption that if rehab costs are 68% or more of replacement costs, the replacem&amp;#039;t is better value&lt;/p&gt;
&lt;a href=&quot;https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;amp;diff=25007&amp;amp;oldid=24303&quot;&gt;Show changes&lt;/a&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;diff=24303&amp;oldid=prev</id>
		<title>Smithk: Per LPA Coordinator, FHWA and MoDOT&#039;s senior management:  Final inspection to be performed by a team leader certified inspector.  Also, clarification of noncontroversial.</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;diff=24303&amp;oldid=prev"/>
		<updated>2010-09-07T18:12:31Z</updated>

		<summary type="html">&lt;p&gt;Per LPA Coordinator, FHWA and MoDOT&amp;#039;s senior management:  Final inspection to be performed by a team leader certified inspector.  Also, clarification of noncontroversial.&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 13:12, 7 September 2010&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l4&quot;&gt;Line 4:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 4:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The bridge being replaced or rehabilitated for which the agency desires credit must meet the&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The bridge being replaced or rehabilitated for which the agency desires credit must meet the&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;contractual requirements of the local agency and the MoDOT intent of [[136.1 General#136.1.6.1 Highway Bridge Program|the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;HBP&lt;/del&gt;]] as defined under Federally Funded Bridge Projects in [[136.1 General|EPG 136.1 General]].&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;contractual requirements of the local agency and the MoDOT intent of [[136.1 General#136.1.6.1 Highway Bridge Program|the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Highway Brige Program&lt;/ins&gt;]] &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;(HBP) &lt;/ins&gt;as defined under Federally Funded Bridge Projects in [[136.1 General|EPG 136.1 General]].&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;One of the purposes of the Bridge Soft Match Credit Program is to provide an alternate process&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;One of the purposes of the Bridge Soft Match Credit Program is to provide an alternate process&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l12&quot;&gt;Line 12:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 12:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;constructed by qualified local agency forces, competitive bid, or negotiated bid. (Refer to [[136.9 Final Design|EPG 136.9 Final Design]] for information regarding work by local forces.)&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;constructed by qualified local agency forces, competitive bid, or negotiated bid. (Refer to [[136.9 Final Design|EPG 136.9 Final Design]] for information regarding work by local forces.)&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The design drawings shall be prepared under the direction of a registered professional engineer and signed and sealed. By signing and sealing the drawings, the engineer of record will be representing that the MoDOT intent has been met in accordance with the criteria set forth in [[136.1 General|EPG 136.1 &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;general&lt;/del&gt;]]. A registered professional engineer shall direct the construction inspection.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The design drawings shall be prepared under the direction of a registered professional engineer and &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;be &lt;/ins&gt;signed and sealed &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;by that engineer&lt;/ins&gt;. By signing and sealing the drawings, the engineer of record will be representing that the MoDOT intent &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;of the HBP &lt;/ins&gt;has been met in accordance with the criteria set forth in [[136.1 General|EPG 136.1 &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;General&lt;/ins&gt;]]. A registered professional engineer shall direct the construction inspection.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.1 Project Selection===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.1 Project Selection===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l30&quot;&gt;Line 30:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 30:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Any federal funds above this 20% will reduce the costs eligible for credit.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Any federal funds above this 20% will reduce the costs eligible for credit.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Only a minimal amount of approach work may be counted. Eligible limits may include reasonable&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Only a minimal amount of approach &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;roadway &lt;/ins&gt;work may be counted. Eligible limits may include reasonable approach roadway necessary to connect to the existing road and to return the new grade to normal ground. This corresponds to &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the &lt;/ins&gt;eligible limits of HBP projects authorized to date.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;approach roadway necessary to connect to the existing road and to return the new grade to normal&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;ground. This corresponds to eligible limits of HBP projects authorized to date.&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.3 Final Design===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.3 Final Design===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;For &lt;/del&gt;projects for which credit is desired, the engineer of record shall have the responsibility for the selection of the specific design parameters along with verifying that the MoDOT intent of the HBP is being met as described and given in [[136.1 General|EPG 136.1 General]] and [[136.8 Preliminary Design|EPG 136.8 Preliminary Design]].&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;On &lt;/ins&gt;projects for which credit is desired, the engineer of record shall have the responsibility for the selection of the specific design parameters along with verifying that the MoDOT intent of the HBP is being met as described and given in [[136.1 General|EPG 136.1 General]] and [[136.8 Preliminary Design|EPG 136.8 Preliminary Design]].&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The specifications and job special provisions for the project shall also be determined by the engineer based on specific site conditions and guidance given in [[136.9 Final Design|EPG 136.9 Final Design]].&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The specifications and job special provisions for the project shall also be determined by the engineer based on specific site conditions and guidance given in [[136.9 Final Design|EPG 136.9 Final Design]].&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l46&quot;&gt;Line 46:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 44:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.5 Construction===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.5 Construction===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;The federal requirements for construction in [[136.11 Local Public Agency Construction|EPG 136.11 Local Public Agency Construction]] may be waived.&#039;&#039;&#039; The construction inspection, testing and sampling shall be done under the direction of registered engineer.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;The federal requirements for construction in [[136.11 Local Public Agency Construction|EPG 136.11 Local Public Agency Construction]] may be waived.&#039;&#039;&#039; The construction inspection, testing and sampling shall be done under the direction of &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;a &lt;/ins&gt;registered &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;professional &lt;/ins&gt;engineer.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.6 Request for Credit Submittal===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.6 Request for Credit Submittal===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l59&quot;&gt;Line 59:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 57:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;3.&amp;#039;&amp;#039;&amp;#039; Beginning and completion dates for construction.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;3.&amp;#039;&amp;#039;&amp;#039; Beginning and completion dates for construction.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;4.&#039;&#039;&#039; A certification by the local agency stating that the project is &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;not &lt;/del&gt;controversial &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;and that the project being considered has been constructed in accordance with the standards applicable to [[136&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;1 General#136.1.6.1 Highway Bridge Program|&lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;HBP]] except as set out. Certification by &lt;/del&gt;the bridge &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;owner that all of the required clearances were obtained prior to construction. Also&lt;/del&gt;, &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;certification &lt;/del&gt;that the project &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;was constructed substantially in conformity with the plans and specifications&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;4.&#039;&#039;&#039; A certification by the local agency stating that the project is &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;non-&lt;/ins&gt;controversial. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;For &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;purposes of &lt;/ins&gt;the bridge &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;credit program&lt;/ins&gt;, &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&quot;non-controversial&quot; will be defined as meaning &lt;/ins&gt;that the project &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;does not have a history of litigation, disputes, negative media reports or any other controversy&lt;/ins&gt;. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;5.&#039;&#039;&#039; &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Documentation of eligible final costs, and &lt;/del&gt;certification by the local agency that the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;costs claimed are &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;actual costs incurred&lt;/del&gt;. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;If quantities documented for costs don&#039;t match &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;list of quantities &lt;/del&gt;as &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;compared to the engineer’s pre-construction itemized cost estimate, the local agency should submit justification for a change &lt;/del&gt;in &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the planned quantities&lt;/del&gt;. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;If the existing structure is currently eligible for rehabilitation only and the local agency elects to replace the structure&lt;/del&gt;, the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;amount of eligible federal funding will be limited &lt;/del&gt;to &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;that which will not exceed the rehabilitation cost estimate unless appropriate justification is provided by the local agency that a new structure represents the best value. If the rehabilitation cost is at least 68% &lt;/del&gt;of the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;replacement costs, it can generally be assumed &lt;/del&gt;that the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;new replacement structure will provide a better value than &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;rehabilitation of the existing structure &lt;/del&gt;and &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;therefore a better use of federal bridge funds&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;5.&#039;&#039;&#039; &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;A &lt;/ins&gt;certification by the local agency &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;stating &lt;/ins&gt;that the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;project being considered has been constructed in accordance with &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;standards applicable to [[136.1 General#136.1&lt;/ins&gt;.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;6.1 Highway Bridge Program|&lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;HBP]], except &lt;/ins&gt;as &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;noted &lt;/ins&gt;in &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;EPG 136&lt;/ins&gt;.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;2&lt;/ins&gt;, &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;that all of &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;required clearances were obtained prior &lt;/ins&gt;to &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;construction &lt;/ins&gt;of the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;project and &lt;/ins&gt;that the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;project was constructed substantially in conformity with &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;plans &lt;/ins&gt;and &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;specifications&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;6.&#039;&#039;&#039; &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;A minimum &lt;/del&gt;of &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;two photographs showing bridge along roadway &lt;/del&gt;and &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;stream opening&lt;/del&gt;. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Additional photographs showing &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;bridge &lt;/del&gt;construction &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;are also recommended but &lt;/del&gt;not &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;required&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;6.&#039;&#039;&#039; &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Documentation &lt;/ins&gt;of &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;eligible final costs, &lt;/ins&gt;and &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;certification by the local agency that the costs claimed are the actual costs incurred&lt;/ins&gt;. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;If quantities documented for costs don&#039;t match the list of quantities as compared to &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;engineer’s pre-&lt;/ins&gt;construction &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;itemized cost estimate, the local agency should submit justification for a change in the planned quantities. If the existing structure is currently eligible for rehabilitation only and the local agency elects to replace the structure, the amount of eligible federal funding will be limited to that which will &lt;/ins&gt;not &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;exceed the rehabilitation cost estimate unless appropriate justification is provided by the local agency that a new structure represents the best value. If the rehabilitation cost is at least 68% of the replacement costs, it can generally be assumed that the new replacement structure will provide a better value than the rehabilitation of the existing structure and therefore a better use of federal bridge funds&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;7.&#039;&#039;&#039; After construction has been completed, a [&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;http&lt;/del&gt;:&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;//www&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;modot&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;mo&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;gov/ MoDOT district representative] shall perform a final “walk-through” &lt;/del&gt;inspection &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;to &lt;/del&gt;verify that the bridge was constructed in general conformance with the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;submitted “as built” &lt;/del&gt;plans&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;. Typically, the inspection should verify that &lt;/del&gt;the bridge location, type, width, length&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;, &lt;/del&gt;and members &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;correspond to the “as built” plans&lt;/del&gt;. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Also&lt;/del&gt;, the inspection &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;should verify that &lt;/del&gt;the bridge &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;is considered &lt;/del&gt;to be in &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;“good” &lt;/del&gt;condition&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;. It should be noted on &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;cover letter with &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;submittal package &lt;/del&gt;that the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;final &lt;/del&gt;inspection &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;was completed &lt;/del&gt;and &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;it &lt;/del&gt;is &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;recommended &lt;/del&gt;that credit be &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;given &lt;/del&gt;for the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;structure&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;7&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;.&#039;&#039;&#039; A minimum of two photographs showing a view of the bridge along roadway and a view of the bridge from the stream opening. Additional photographs showing the bridge construction are also recommended but not required.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt; &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&#039;&#039;&#039;8&lt;/ins&gt;.&#039;&#039;&#039; After &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the &lt;/ins&gt;construction &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;of the bridge &lt;/ins&gt;has been completed, a &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;final &quot;walk-through&quot; inspection of the bridge has to be completed by MoDOT.  This final inspection has to be completed by someone in the district that has been Team Leader certified for nonstate bridge inspections as designated in [&lt;/ins&gt;[:&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Category:753 Bridge Inspection Rating|EPG 753&lt;/ins&gt;.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;3 Inspection and Reporting Aids (Section 3)]]&lt;/ins&gt;. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; This inspection should include the assignment of appraisal and condition ratings consistent with the normal inspection practice for nonstate bridges&lt;/ins&gt;. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; This &lt;/ins&gt;inspection &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;should also &lt;/ins&gt;verify that the bridge &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;is in &quot;good&quot; condition and &lt;/ins&gt;was constructed in general conformance with the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;bridge &lt;/ins&gt;plans &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;(including verification of &lt;/ins&gt;the bridge location, &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;bridge &lt;/ins&gt;type, width, length and &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the number of &lt;/ins&gt;members&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;)&lt;/ins&gt;. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; Once completed&lt;/ins&gt;, &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the inspector should submit a copy of &lt;/ins&gt;the inspection &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;report and a letter to the district person overseeing credit projects indicating the date &lt;/ins&gt;the bridge &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;was inspected, that it was found &lt;/ins&gt;to be in &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&quot;good&quot; &lt;/ins&gt;condition &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;and that &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;location, type, width, length and number of members match &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;plans indicating &lt;/ins&gt;that the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;bridge was built in general conformance with the plans.  Once this &lt;/ins&gt;inspection &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;is complete &lt;/ins&gt;and &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;all other required information &lt;/ins&gt;is &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;obtained from the local agency, the district should submit the bridge credit package to Bridge Division along with a cover letter recommending &lt;/ins&gt;that credit be &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;approved &lt;/ins&gt;for &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;this bridge project.  The credit submittal package should include copies of the letter and inspection report from &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;inspector&lt;/ins&gt;.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.7 Use of Soft Match Credit===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.7 Use of Soft Match Credit===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;diff=23892&amp;oldid=prev</id>
		<title>Smithk: /* 136.2.6 Request for Credit Submittal */ minor corrections</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;diff=23892&amp;oldid=prev"/>
		<updated>2010-07-13T14:23:07Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;136.2.6 Request for Credit Submittal: &lt;/span&gt; minor corrections&lt;/span&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 09:23, 13 July 2010&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l61&quot;&gt;Line 61:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 61:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;4.&amp;#039;&amp;#039;&amp;#039; A certification by the local agency stating that the project is not controversial and that the project being considered has been constructed in accordance with the standards applicable to [[136.1 General#136.1.6.1 Highway Bridge Program|the HBP]] except as set out. Certification by the bridge owner that all of the required clearances were obtained prior to construction. Also, certification that the project was constructed substantially in conformity with the plans and specifications.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;4.&amp;#039;&amp;#039;&amp;#039; A certification by the local agency stating that the project is not controversial and that the project being considered has been constructed in accordance with the standards applicable to [[136.1 General#136.1.6.1 Highway Bridge Program|the HBP]] except as set out. Certification by the bridge owner that all of the required clearances were obtained prior to construction. Also, certification that the project was constructed substantially in conformity with the plans and specifications.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;5.&#039;&#039;&#039; Documentation of eligible final costs, and certification by the local agency that the costs claimed are the actual costs incurred. If quantities documented for costs don&#039;t match the list of quantities as compared to the engineer’s pre-construction itemized cost estimate, the local agency should submit justification for a change in the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;plannedquantities&lt;/del&gt;. If the existing structure is currently eligible for rehabilitation only and the local agency elects to replace the structure, the amount of eligible federal funding will be limited &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;tothat &lt;/del&gt;which will not exceed the rehabilitation cost estimate unless appropriate justification &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;isprovided &lt;/del&gt;by the local agency that a new structure represents the best value. If &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;therehabilitation &lt;/del&gt;cost is at least 68% of the replacement costs, it can generally be assumed &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;thatthe &lt;/del&gt;new replacement structure will provide a better value than the rehabilitation of the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;existingstructure &lt;/del&gt;and therefore a better use of federal bridge funds.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;5.&#039;&#039;&#039; Documentation of eligible final costs, and certification by the local agency that the costs claimed are the actual costs incurred. If quantities documented for costs don&#039;t match the list of quantities as compared to the engineer’s pre-construction itemized cost estimate, the local agency should submit justification for a change in the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;planned quantities&lt;/ins&gt;. If the existing structure is currently eligible for rehabilitation only and the local agency elects to replace the structure, the amount of eligible federal funding will be limited &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;to that &lt;/ins&gt;which will not exceed the rehabilitation cost estimate unless appropriate justification &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;is provided &lt;/ins&gt;by the local agency that a new structure represents the best value. If &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the rehabilitation &lt;/ins&gt;cost is at least 68% of the replacement costs, it can generally be assumed &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;that the &lt;/ins&gt;new replacement structure will provide a better value than the rehabilitation of the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;existing structure &lt;/ins&gt;and therefore a better use of federal bridge funds.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;6.&amp;#039;&amp;#039;&amp;#039; A minimum of two photographs showing bridge along roadway and stream opening. Additional photographs showing the bridge construction are also recommended but not required.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;6.&amp;#039;&amp;#039;&amp;#039; A minimum of two photographs showing bridge along roadway and stream opening. Additional photographs showing the bridge construction are also recommended but not required.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;diff=23250&amp;oldid=prev</id>
		<title>Smithk: /* 136.2.5 Construction */ Updated link</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;diff=23250&amp;oldid=prev"/>
		<updated>2010-06-18T15:21:14Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;136.2.5 Construction: &lt;/span&gt; Updated link&lt;/span&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 10:21, 18 June 2010&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l46&quot;&gt;Line 46:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 46:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.5 Construction===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.5 Construction===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;The federal requirements for construction in [[136.11 Construction|EPG 136.11 Construction]] may be waived.&#039;&#039;&#039; The construction inspection, testing and sampling shall be done under the direction of registered engineer.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;The federal requirements for construction in [[136.11 &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Local Public Agency &lt;/ins&gt;Construction|EPG 136.11 &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Local Public Agency &lt;/ins&gt;Construction]] may be waived.&#039;&#039;&#039; The construction inspection, testing and sampling shall be done under the direction of registered engineer.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.6 Request for Credit Submittal===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.6 Request for Credit Submittal===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;diff=22544&amp;oldid=prev</id>
		<title>Smithk: minor clarifications</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;diff=22544&amp;oldid=prev"/>
		<updated>2010-04-01T13:42:28Z</updated>

		<summary type="html">&lt;p&gt;minor clarifications&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 08:42, 1 April 2010&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l4&quot;&gt;Line 4:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 4:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The bridge being replaced or rehabilitated for which the agency desires credit must meet the&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The bridge being replaced or rehabilitated for which the agency desires credit must meet the&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;contractual requirements of the local agency and the MoDOT intent of [[136.1 General#136.1.6.1 Highway Bridge Program|the HBP]] as defined under Federally Funded Bridge Projects in [[136.1 General|136.1 General]].&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;contractual requirements of the local agency and the MoDOT intent of [[136.1 General#136.1.6.1 Highway Bridge Program|the HBP]] as defined under Federally Funded Bridge Projects in [[136.1 General|&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;EPG &lt;/ins&gt;136.1 General]].&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;One of the purposes of the Bridge Soft Match Credit Program is to provide an alternate process&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;One of the purposes of the Bridge Soft Match Credit Program is to provide an alternate process&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l10&quot;&gt;Line 10:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 10:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;The federal contract requirements and clearances by federal agencies may be waived, but all state and local contract requirements and clearances shall still be met.&amp;#039;&amp;#039;&amp;#039; Projects may be&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;The federal contract requirements and clearances by federal agencies may be waived, but all state and local contract requirements and clearances shall still be met.&amp;#039;&amp;#039;&amp;#039; Projects may be&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;constructed by qualified local agency forces, competitive bid, or negotiated bid. (Refer to [[136.9 Final Design|136.9 Final Design]] for information regarding work by local forces.)&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;constructed by qualified local agency forces, competitive bid, or negotiated bid. (Refer to [[136.9 Final Design|&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;EPG &lt;/ins&gt;136.9 Final Design]] for information regarding work by local forces.)&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The design drawings shall be prepared under the direction of a registered professional engineer and signed and sealed. By signing and sealing the drawings, the engineer of record will be representing that the MoDOT intent has been met in accordance with the criteria set forth in [[136.1 General|136.1 general]]. A registered professional engineer shall direct the construction inspection.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The design drawings shall be prepared under the direction of a registered professional engineer and signed and sealed. By signing and sealing the drawings, the engineer of record will be representing that the MoDOT intent has been met in accordance with the criteria set forth in [[136.1 General|&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;EPG &lt;/ins&gt;136.1 general]]. A registered professional engineer shall direct the construction inspection.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.1 Project Selection===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.1 Project Selection===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l35&quot;&gt;Line 35:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 35:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.3 Final Design===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.3 Final Design===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;For projects for which credit is desired, the engineer of record shall have the responsibility for the selection of the specific design parameters along with verifying that the MoDOT intent of the HBP is being met as described and given in [[136.1 General|136.1 General]] and [[136.8 Preliminary Design|136.8 Preliminary Design]].&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;For projects for which credit is desired, the engineer of record shall have the responsibility for the selection of the specific design parameters along with verifying that the MoDOT intent of the HBP is being met as described and given in [[136.1 General|&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;EPG &lt;/ins&gt;136.1 General]] and [[136.8 Preliminary Design|&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;EPG &lt;/ins&gt;136.8 Preliminary Design]].&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The specifications and job special provisions for the project shall also be determined by the engineer based on specific site conditions and guidance given in [[136.9 Final Design|136.9 Final Design]].&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The specifications and job special provisions for the project shall also be determined by the engineer based on specific site conditions and guidance given in [[136.9 Final Design|&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;EPG &lt;/ins&gt;136.9 Final Design]].&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;A preconstruction itemized engineer&amp;#039;s cost estimate is required to be retained by the engineer with the project file. This estimate will be based either on the local forces constructing the project or on a contractor constructing the project.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;A preconstruction itemized engineer&amp;#039;s cost estimate is required to be retained by the engineer with the project file. This estimate will be based either on the local forces constructing the project or on a contractor constructing the project.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.4 Construction Letting===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.4 Construction Letting===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;The Federal Aid contract requirements of [[136.10 Construction Authorization and Letting|136.10 Construction Authorization and Letting]] are not required.&#039;&#039;&#039; When the local agency elects to build the project by contractor, then the State and Local requirements for competitive bidding shall be used.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;The Federal Aid contract requirements of [[136.10 Construction Authorization and Letting|&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;EPG &lt;/ins&gt;136.10 Construction Authorization and Letting]] are not required.&#039;&#039;&#039; When the local agency elects to build the project by contractor, then the State and Local requirements for competitive bidding shall be used.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.5 Construction===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.5 Construction===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;The federal requirements for construction in [[136.11 Construction|136.11 Construction]] may be waived.&#039;&#039;&#039; The construction inspection, testing and sampling shall be done under the direction of registered engineer.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;The federal requirements for construction in [[136.11 Construction|&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;EPG &lt;/ins&gt;136.11 Construction]] may be waived.&#039;&#039;&#039; The construction inspection, testing and sampling shall be done under the direction of registered engineer.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.6 Request for Credit Submittal===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===136.2.6 Request for Credit Submittal===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l53&quot;&gt;Line 53:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 53:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The credit submittal should include the following:&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The credit submittal should include the following:&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;1.&#039;&#039;&#039; As built plans and specifications (size 11 in. x 17in.) signed and sealed by a registered professional engineer and approved by the local agency. Refer to [[136.9 Final Design|136.9 Final Design]] for specific requirements.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;1.&#039;&#039;&#039; As built plans and specifications (size 11 in. x 17in.) signed and sealed by a registered professional engineer and approved by the local agency. Refer to [[136.9 Final Design|&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;EPG &lt;/ins&gt;136.9 Final Design]] for specific requirements.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;2.&#039;&#039;&#039; Structural Inventory and Appraisal (SI&amp;amp;A) sheet completed for the bridge improvement with load rating calculations and Load Rating Summary Sheet signed and sealed by a registered professional engineer. Refer to [[136.9 Final Design|136.9 Final Design]] for specific requirements.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;2.&#039;&#039;&#039; Structural Inventory and Appraisal (SI&amp;amp;A) sheet completed for the bridge improvement with load rating calculations and Load Rating Summary Sheet signed and sealed by a registered professional engineer. Refer to [[136.9 Final Design|&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;EPG &lt;/ins&gt;136.9 Final Design]] for specific requirements.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;3.&amp;#039;&amp;#039;&amp;#039; Beginning and completion dates for construction.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;3.&amp;#039;&amp;#039;&amp;#039; Beginning and completion dates for construction.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;diff=21311&amp;oldid=prev</id>
		<title>Smithk: new article from former LPA Manual, per RM</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=136.2_Bridge_Soft_Match_Credit_Program&amp;diff=21311&amp;oldid=prev"/>
		<updated>2009-10-06T17:47:10Z</updated>

		<summary type="html">&lt;p&gt;new article from former LPA Manual, per RM&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;[[image:136.2.jpg|center|775px]]&lt;br /&gt;
Federal regulations originating in Section 123(e) of the 1987 Surface Transportation and Uniform&lt;br /&gt;
Relocation Assistance Act (STURAA) provides that agencies (state, county, or city) may receive soft match credit for the cost of a locally funded bridge replacement or rehabilitation that would count toward the local match on federally funded bridge replacement projects. It is not the intent of the program to give credit for all bridge work that is done by the local agency, but only for the eligible replacement and rehabilitation work which is performed according to the appropriate guidelines.&lt;br /&gt;
&lt;br /&gt;
The bridge being replaced or rehabilitated for which the agency desires credit must meet the&lt;br /&gt;
contractual requirements of the local agency and the MoDOT intent of [[136.1 General#136.1.6.1 Highway Bridge Program|the HBP]] as defined under Federally Funded Bridge Projects in [[136.1 General|136.1 General]].&lt;br /&gt;
&lt;br /&gt;
One of the purposes of the Bridge Soft Match Credit Program is to provide an alternate process&lt;br /&gt;
for local agencies to remove deficient bridges from the Bridge Inventory. A number of requirements that would apply to projects receiving HBP funding are waived in the Soft Match Credit Program. These exceptions are highlighted in bold print in this article.&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;The federal contract requirements and clearances by federal agencies may be waived, but all state and local contract requirements and clearances shall still be met.&amp;#039;&amp;#039;&amp;#039; Projects may be&lt;br /&gt;
constructed by qualified local agency forces, competitive bid, or negotiated bid. (Refer to [[136.9 Final Design|136.9 Final Design]] for information regarding work by local forces.)&lt;br /&gt;
&lt;br /&gt;
The design drawings shall be prepared under the direction of a registered professional engineer and signed and sealed. By signing and sealing the drawings, the engineer of record will be representing that the MoDOT intent has been met in accordance with the criteria set forth in [[136.1 General|136.1 general]]. A registered professional engineer shall direct the construction inspection.&lt;br /&gt;
&lt;br /&gt;
===136.2.1 Project Selection===&lt;br /&gt;
The bridge must be on MoDOT&amp;#039;s eligible list for funding for off federal aid routes. These functional classifications include rural local, rural minor collector and urban local.&lt;br /&gt;
&lt;br /&gt;
Projects involving removal of an eligible bridge that is replaced with something other than a new bridge are eligible. (For example, replacing a bridge over an abandoned railroad with roadway fill.)&lt;br /&gt;
&lt;br /&gt;
===136.2.2 Eligible Costs for Soft Match Credit===&lt;br /&gt;
An agency may receive credit for no more than 80% of the eligible costs. The items that are eligible for receiving credit include preliminary engineering services, surveys, environmental and cultural documentation, subsurface investigations, right of way services, bridge construction, minimal road construction, construction engineering for inspection, and those portions of utility relocation costs for which the county is obligated.&lt;br /&gt;
&lt;br /&gt;
The following federal funds from other federal agencies may be used on credit projects but only up to a maximum of 20% of the eligible costs.&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;1.&amp;#039;&amp;#039;&amp;#039; Community Development Block Grant Funds if authorized by the Department of Housing and Urban Development&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;2.&amp;#039;&amp;#039;&amp;#039; Local Public Works Funds authorized by the Economic Development Administration.&lt;br /&gt;
&lt;br /&gt;
Any federal funds above this 20% will reduce the costs eligible for credit.&lt;br /&gt;
&lt;br /&gt;
Only a minimal amount of approach work may be counted. Eligible limits may include reasonable&lt;br /&gt;
approach roadway necessary to connect to the existing road and to return the new grade to normal&lt;br /&gt;
ground. This corresponds to eligible limits of HBP projects authorized to date.&lt;br /&gt;
&lt;br /&gt;
===136.2.3 Final Design===&lt;br /&gt;
For projects for which credit is desired, the engineer of record shall have the responsibility for the selection of the specific design parameters along with verifying that the MoDOT intent of the HBP is being met as described and given in [[136.1 General|136.1 General]] and [[136.8 Preliminary Design|136.8 Preliminary Design]].&lt;br /&gt;
&lt;br /&gt;
The specifications and job special provisions for the project shall also be determined by the engineer based on specific site conditions and guidance given in [[136.9 Final Design|136.9 Final Design]].&lt;br /&gt;
&lt;br /&gt;
A preconstruction itemized engineer&amp;#039;s cost estimate is required to be retained by the engineer with the project file. This estimate will be based either on the local forces constructing the project or on a contractor constructing the project.&lt;br /&gt;
&lt;br /&gt;
===136.2.4 Construction Letting===&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;The Federal Aid contract requirements of [[136.10 Construction Authorization and Letting|136.10 Construction Authorization and Letting]] are not required.&amp;#039;&amp;#039;&amp;#039; When the local agency elects to build the project by contractor, then the State and Local requirements for competitive bidding shall be used.&lt;br /&gt;
&lt;br /&gt;
===136.2.5 Construction===&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;The federal requirements for construction in [[136.11 Construction|136.11 Construction]] may be waived.&amp;#039;&amp;#039;&amp;#039; The construction inspection, testing and sampling shall be done under the direction of registered engineer.&lt;br /&gt;
&lt;br /&gt;
===136.2.6 Request for Credit Submittal===&lt;br /&gt;
Formal acceptance of the project for credit will be requested by the local agency after the project has been completed, documentation of final construction cost submitted, and the bridge has been added to the bridge inventory. Submittal at the PS&amp;amp;E stage of the project is not necessary. However, if the engineer or local agency have specific eligibility questions regarding the project that they would like MoDOT to address before construction then we are receptive to receiving the PS&amp;amp;E submittal. Specific questions should be provided by the engineer or local agency on their cover letter with the submitted package.&lt;br /&gt;
&lt;br /&gt;
The credit submittal should include the following:&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;1.&amp;#039;&amp;#039;&amp;#039; As built plans and specifications (size 11 in. x 17in.) signed and sealed by a registered professional engineer and approved by the local agency. Refer to [[136.9 Final Design|136.9 Final Design]] for specific requirements.&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;2.&amp;#039;&amp;#039;&amp;#039; Structural Inventory and Appraisal (SI&amp;amp;A) sheet completed for the bridge improvement with load rating calculations and Load Rating Summary Sheet signed and sealed by a registered professional engineer. Refer to [[136.9 Final Design|136.9 Final Design]] for specific requirements.&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;3.&amp;#039;&amp;#039;&amp;#039; Beginning and completion dates for construction.&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;4.&amp;#039;&amp;#039;&amp;#039; A certification by the local agency stating that the project is not controversial and that the project being considered has been constructed in accordance with the standards applicable to [[136.1 General#136.1.6.1 Highway Bridge Program|the HBP]] except as set out. Certification by the bridge owner that all of the required clearances were obtained prior to construction. Also, certification that the project was constructed substantially in conformity with the plans and specifications.&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;5.&amp;#039;&amp;#039;&amp;#039; Documentation of eligible final costs, and certification by the local agency that the costs claimed are the actual costs incurred. If quantities documented for costs don&amp;#039;t match the list of quantities as compared to the engineer’s pre-construction itemized cost estimate, the local agency should submit justification for a change in the plannedquantities. If the existing structure is currently eligible for rehabilitation only and the local agency elects to replace the structure, the amount of eligible federal funding will be limited tothat which will not exceed the rehabilitation cost estimate unless appropriate justification isprovided by the local agency that a new structure represents the best value. If therehabilitation cost is at least 68% of the replacement costs, it can generally be assumed thatthe new replacement structure will provide a better value than the rehabilitation of the existingstructure and therefore a better use of federal bridge funds.&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;6.&amp;#039;&amp;#039;&amp;#039; A minimum of two photographs showing bridge along roadway and stream opening. Additional photographs showing the bridge construction are also recommended but not required.&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;7.&amp;#039;&amp;#039;&amp;#039; After construction has been completed, a [http://www.modot.mo.gov/ MoDOT district representative] shall perform a final “walk-through” inspection to verify that the bridge was constructed in general conformance with the submitted “as built” plans. Typically, the inspection should verify that the bridge location, type, width, length, and members correspond to the “as built” plans. Also, the inspection should verify that the bridge is considered to be in “good” condition. It should be noted on the cover letter with the submittal package that the final inspection was completed and it is recommended that credit be given for the structure.&lt;br /&gt;
&lt;br /&gt;
===136.2.7 Use of Soft Match Credit===&lt;br /&gt;
&lt;br /&gt;
The eligible costs may apply as credit toward the 20% local match required on federal-aid bridge&lt;br /&gt;
projects. This credit provision does not increase an agency&amp;#039;s allocation of [[136.1 General#136.1.6.1 Highway Bridge Program|HBP]] funds, but will permit usage of funds already allocated to an agency at a rate up to 100%.&lt;br /&gt;
&lt;br /&gt;
Any BRO project submitted for programming by a local agency will be set up using soft match&lt;br /&gt;
credit, if available. As a result, the local agency&amp;#039;s preliminary engineering costs will be eligible for more than 80% federal reimbursement. As the project moves to construction authorization, credit will continue to be applied, as long as it is available. Counties will not be allowed to have a negative soft match credit balance.&lt;br /&gt;
&lt;br /&gt;
If a local agency does not want to use their soft match credit on a project, they will need to submit a letter to the MoDOT district office indicating this.&lt;br /&gt;
&lt;br /&gt;
Soft match credit can be applied to the construction phase of a bridge project at the time of&lt;br /&gt;
construction authorization, even if soft match credit was not used for the design phase.&lt;br /&gt;
&lt;br /&gt;
The federal reimbursable share of design costs can not be increased by applying additional soft match credit after the preliminary engineering authorization date.&lt;br /&gt;
&lt;br /&gt;
A local agency may elect to transfer its soft match credit earned under the Off-System Bridge Credit Program to another local agency. The following guidelines should be followed to transfer credit:&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;1.&amp;#039;&amp;#039;&amp;#039; A request must be submitted to the MoDOT district office on the local agency&amp;#039;s letterhead, stating the receiving agency and the dollar amount. All the county commissioners or city officials must sign the request.&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;2.&amp;#039;&amp;#039;&amp;#039; The request must be approved prior to using the soft match credit on a bridge project.&lt;br /&gt;
&lt;br /&gt;
A local agency may elect to transfer its soft match credit earned under the Off-System Bridge Credit Program to another local agency for BRO funds. The following guidelines should be followed to transfer credit for funds:&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;1.&amp;#039;&amp;#039;&amp;#039; Both counties must submit requests to the MoDOT district office on their local agency&amp;#039;s&lt;br /&gt;
letterhead, stating the amount of BRO funds and credit to be transferred by each county. All the county commissioners or city officials must sign the requests.&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;2.&amp;#039;&amp;#039;&amp;#039; The request must be approved prior to using the soft match credit and BRO funds on a bridge project.&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;3.&amp;#039;&amp;#039;&amp;#039; No transfer can result in a negative balance of BRO funds.&lt;br /&gt;
&lt;br /&gt;
[[Category:136 Local Public Agency (LPA) Policy|136.02]]&lt;/div&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
</feed>