<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://epgtest3.modot.org/index.php?action=history&amp;feed=atom&amp;title=121.6_STIP_Amendments</id>
	<title>121.6 STIP Amendments - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://epgtest3.modot.org/index.php?action=history&amp;feed=atom&amp;title=121.6_STIP_Amendments"/>
	<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=121.6_STIP_Amendments&amp;action=history"/>
	<updated>2026-04-29T09:20:43Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.42.3</generator>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=121.6_STIP_Amendments&amp;diff=47097&amp;oldid=prev</id>
		<title>Smithk: Per TP, minor updates to links and text specific to STIP amendment process</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=121.6_STIP_Amendments&amp;diff=47097&amp;oldid=prev"/>
		<updated>2020-01-28T15:05:04Z</updated>

		<summary type="html">&lt;p&gt;Per TP, minor updates to links and text specific to STIP amendment process&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 10:05, 28 January 2020&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l2&quot;&gt;Line 2:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 2:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The draft STIP is presented to the [https://www.modot.org/missouri-highways-and-transportation-commission-0 Commission] each May, followed by a public comment period.  The final STIP is presented to the Commission for approval each July.  An amendment is required when adding a project to the STIP outside of the annual STIP update.  There are two types of amendments:  right of way/construction and scoping/design.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The draft STIP is presented to the [https://www.modot.org/missouri-highways-and-transportation-commission-0 Commission] each May, followed by a public comment period.  The final STIP is presented to the Commission for approval each July.  An amendment is required when adding a project to the STIP outside of the annual STIP update.  There are two types of amendments:  right of way/construction and scoping/design.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;Right of &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;way&lt;/del&gt;/Construction Amendments&#039;&#039;&#039;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;Right of &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Way&lt;/ins&gt;/Construction Amendments&#039;&#039;&#039;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;A right of way or construction amendment is required if a project is being added for right of way acquisition with the A-date to be issued in the current fiscal year, or if a new construction project is to be awarded in the current fiscal year.  Amendments are also required when requesting Commission approval of cost share/economic development agreements, regardless of when construction occurs.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;A right of way or construction amendment is required if a project is being added for right of way acquisition with the A-date to be issued in the current fiscal year, or if a new construction project is to be awarded in the current fiscal year.  Amendments are also required when requesting Commission approval of cost share/economic development agreements, regardless of when construction occurs.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l8&quot;&gt;Line 8:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 8:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;New projects split from projects already in the STIP do not need Commission approval so long as the scope of the new project is within the scope of the original project.  The existing project must be listed in the current STIP or its approved amendments.  A split from a project already awarded or not listed in the current STIP is considered a new project and must follow the amendment process.       &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;New projects split from projects already in the STIP do not need Commission approval so long as the scope of the new project is within the scope of the original project.  The existing project must be listed in the current STIP or its approved amendments.  A split from a project already awarded or not listed in the current STIP is considered a new project and must follow the amendment process.       &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;In the rare case that a project programmed in the current fiscal year undergoes a major change, please contact [http://&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;wwwi&lt;/del&gt;/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;intranet&lt;/del&gt;/tp/ Transportation Planning] for guidance.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;In the rare case that a project programmed in the current fiscal year undergoes a major change, please contact [http://&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;sp&lt;/ins&gt;/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;sites&lt;/ins&gt;/tp/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Pages/default.aspx &lt;/ins&gt;Transportation Planning] for guidance.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Amendments for right of way acquisition or construction require Commission approval and are &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;taken &lt;/del&gt;on an as-needed basis. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; &lt;/del&gt;Amendments in the months of May, June&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;, &lt;/del&gt;July&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;, August and September &lt;/del&gt;are strongly discouraged because of the proximity to the draft and final STIP presentations. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; &lt;/del&gt;Requests for amendments should be submitted to Transportation Planning approximately five weeks ahead of the Commission meeting to allow for the required processing, review and public comment period. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; &lt;/del&gt;Following Commission approval, Transportation Planning requests OneDOT (FHWA and FTA) approval of the amendments. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;  &lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Amendments for right of way acquisition or construction require Commission approval and are &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; done &lt;/ins&gt;on an as-needed basis. Amendments in the months of &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;April, &lt;/ins&gt;May, June &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;and &lt;/ins&gt;July are strongly discouraged because of the proximity to the draft and final STIP presentations. Requests for amendments should be submitted to Transportation Planning approximately five weeks ahead of the Commission meeting to allow for the required processing, review and public comment period. Following Commission approval, Transportation Planning requests OneDOT (FHWA and FTA) approval of the amendments. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;   &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;If the project to be amended is located in an [https://www.modot.org/missouri-metropolitan-planning-organizations Metropolitan Planning Organizations (MPO)] area, the district should also initiate a TIP amendment.  Ideally, the TIP amendment precedes the STIP amendment.  Amendments in both MPO and [https://www.modot.org/regional-planning-commissions Regional Planning Commissions (RPC)] areas should have planning partner support.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;If the project to be amended is located in an [https://www.modot.org/missouri-metropolitan-planning-organizations Metropolitan Planning Organizations (MPO)] area, the district should also initiate a TIP amendment.  Ideally, the TIP amendment precedes the STIP amendment.  Amendments in both MPO and [https://www.modot.org/regional-planning-commissions Regional Planning Commissions (RPC)] areas should have planning partner support.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l16&quot;&gt;Line 16:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 16:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;Scoping/Design Amendments&amp;#039;&amp;#039;&amp;#039;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;Scoping/Design Amendments&amp;#039;&amp;#039;&amp;#039;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;A scoping or design amendment is required when a project is being added to the current fiscal year for scoping or design. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; &lt;/del&gt;The scoping/design amendment, besides establishing a STIP job number, also triggers the establishment of an FMS number, which is the number used &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;on timesheets.  &lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;A scoping or design amendment is required when a project is being added to the current fiscal year for scoping or design. The scoping/design amendment, besides establishing a STIP job number, also triggers the establishment of an FMS number, which is the number used to &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;code time &lt;/ins&gt;to &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;scoping/designing &lt;/ins&gt;of the project.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt; &lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;These amendments require Transportation Planning approval and are taken on a monthly basis.  Amendments in the months of May, June, July, August and September are strongly discouraged because of the proximity &lt;/del&gt;to &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the draft and final STIP presentations.  Requests for amendments should be submitted &lt;/del&gt;to &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Transportation Planning no later than one week before the end &lt;/del&gt;of &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the month to allow time for processing, review and approval.  Review consists of determining if the information is correct and if &lt;/del&gt;the project &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;is feasible and consistent with MoDOT’s direction&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;These amendments require Deputy Director/Chief Engineer approval and are taken on a monthly basis. Amendments in the months of April, May, June and July are strongly discouraged because of the proximity to the draft and final STIP presentations. Requests for amendments should be submitted to Transportation Planning no later than one week before the end of the month to allow time for processing, review and approval. Review consists of determining if the information is correct and if the project is feasible and consistent with MoDOT’s direction. &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[Category:121 Project Planning, Prioritization and STIP Commitments |121.06]]&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[Category:121 Project Planning, Prioritization and STIP Commitments |121.06]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=121.6_STIP_Amendments&amp;diff=43859&amp;oldid=prev</id>
		<title>Kleins1: Repaired broken links per revision request #959</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=121.6_STIP_Amendments&amp;diff=43859&amp;oldid=prev"/>
		<updated>2018-10-05T14:53:11Z</updated>

		<summary type="html">&lt;p&gt;Repaired broken links per revision request #959&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 09:53, 5 October 2018&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l1&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[image:121.6.jpg|right|140px]]&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[image:121.6.jpg|right|140px]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The draft STIP is presented to the [&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;http&lt;/del&gt;://www.modot.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;mo.gov/about&lt;/del&gt;/commission&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;/index.htm &lt;/del&gt;Commission] each May, followed by a public comment period.  The final STIP is presented to the Commission for approval each July.  An amendment is required when adding a project to the STIP outside of the annual STIP update.  There are two types of amendments:  right of way/construction and scoping/design.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The draft STIP is presented to the [&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;https&lt;/ins&gt;://www.modot.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;org&lt;/ins&gt;/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;missouri-highways-and-transportation-&lt;/ins&gt;commission&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;-0 &lt;/ins&gt;Commission] each May, followed by a public comment period.  The final STIP is presented to the Commission for approval each July.  An amendment is required when adding a project to the STIP outside of the annual STIP update.  There are two types of amendments:  right of way/construction and scoping/design.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;Right of way/Construction Amendments&amp;#039;&amp;#039;&amp;#039;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;Right of way/Construction Amendments&amp;#039;&amp;#039;&amp;#039;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l12&quot;&gt;Line 12:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 12:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Amendments for right of way acquisition or construction require Commission approval and are taken on an as-needed basis.  Amendments in the months of May, June, July, August and September are strongly discouraged because of the proximity to the draft and final STIP presentations.  Requests for amendments should be submitted to Transportation Planning approximately five weeks ahead of the Commission meeting to allow for the required processing, review and public comment period.  Following Commission approval, Transportation Planning requests OneDOT (FHWA and FTA) approval of the amendments.    &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Amendments for right of way acquisition or construction require Commission approval and are taken on an as-needed basis.  Amendments in the months of May, June, July, August and September are strongly discouraged because of the proximity to the draft and final STIP presentations.  Requests for amendments should be submitted to Transportation Planning approximately five weeks ahead of the Commission meeting to allow for the required processing, review and public comment period.  Following Commission approval, Transportation Planning requests OneDOT (FHWA and FTA) approval of the amendments.    &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;If the project to be amended is located in an [&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;http&lt;/del&gt;://www.modot.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;mo.gov&lt;/del&gt;/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;plansandprojects/long&lt;/del&gt;-&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;range_plan/workingtogethermetropolitanplanning.htm Metrpolitan &lt;/del&gt;Planning Organizations (MPO)] area, the district should also initiate a TIP amendment.  Ideally, the TIP amendment precedes the STIP amendment.  Amendments in both MPO and [&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;http&lt;/del&gt;://www.modot.org/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;plansandprojects/long&lt;/del&gt;-&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;range_plan/workingtogetherregionalplanningcommissions.htm &lt;/del&gt;Regional Planning Commissions (RPC)] areas should have planning partner support.  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;If the project to be amended is located in an [&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;https&lt;/ins&gt;://www.modot.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;org&lt;/ins&gt;/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;missouri-metropolitan-planning&lt;/ins&gt;-&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;organizations Metropolitan &lt;/ins&gt;Planning Organizations (MPO)] area, the district should also initiate a TIP amendment.  Ideally, the TIP amendment precedes the STIP amendment.  Amendments in both MPO and [&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;https&lt;/ins&gt;://www.modot.org/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;regional-planning&lt;/ins&gt;-&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;commissions &lt;/ins&gt;Regional Planning Commissions (RPC)] areas should have planning partner support.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;Scoping/Design Amendments&amp;#039;&amp;#039;&amp;#039;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;Scoping/Design Amendments&amp;#039;&amp;#039;&amp;#039;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Kleins1</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=121.6_STIP_Amendments&amp;diff=16634&amp;oldid=prev</id>
		<title>Smithk: article construction</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=121.6_STIP_Amendments&amp;diff=16634&amp;oldid=prev"/>
		<updated>2008-01-18T19:40:05Z</updated>

		<summary type="html">&lt;p&gt;article construction&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 14:40, 18 January 2008&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l1&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;[[image:121.6.jpg|right|140px]]&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The draft STIP is presented to the [http://www.modot.mo.gov/about/commission/index.htm Commission] each May, followed by a public comment period.  The final STIP is presented to the Commission for approval each July.  An amendment is required when adding a project to the STIP outside of the annual STIP update.  There are two types of amendments:  right of way/construction and scoping/design.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The draft STIP is presented to the [http://www.modot.mo.gov/about/commission/index.htm Commission] each May, followed by a public comment period.  The final STIP is presented to the Commission for approval each July.  An amendment is required when adding a project to the STIP outside of the annual STIP update.  There are two types of amendments:  right of way/construction and scoping/design.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=121.6_STIP_Amendments&amp;diff=16625&amp;oldid=prev</id>
		<title>Smithk: info from Planning</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=121.6_STIP_Amendments&amp;diff=16625&amp;oldid=prev"/>
		<updated>2008-01-18T15:12:09Z</updated>

		<summary type="html">&lt;p&gt;info from Planning&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;The draft STIP is presented to the [http://www.modot.mo.gov/about/commission/index.htm Commission] each May, followed by a public comment period.  The final STIP is presented to the Commission for approval each July.  An amendment is required when adding a project to the STIP outside of the annual STIP update.  There are two types of amendments:  right of way/construction and scoping/design.&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;Right of way/Construction Amendments&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
&lt;br /&gt;
A right of way or construction amendment is required if a project is being added for right of way acquisition with the A-date to be issued in the current fiscal year, or if a new construction project is to be awarded in the current fiscal year.  Amendments are also required when requesting Commission approval of cost share/economic development agreements, regardless of when construction occurs.&lt;br /&gt;
&lt;br /&gt;
New projects split from projects already in the STIP do not need Commission approval so long as the scope of the new project is within the scope of the original project.  The existing project must be listed in the current STIP or its approved amendments.  A split from a project already awarded or not listed in the current STIP is considered a new project and must follow the amendment process.      &lt;br /&gt;
&lt;br /&gt;
In the rare case that a project programmed in the current fiscal year undergoes a major change, please contact [http://wwwi/intranet/tp/ Transportation Planning] for guidance. &lt;br /&gt;
&lt;br /&gt;
Amendments for right of way acquisition or construction require Commission approval and are taken on an as-needed basis.  Amendments in the months of May, June, July, August and September are strongly discouraged because of the proximity to the draft and final STIP presentations.  Requests for amendments should be submitted to Transportation Planning approximately five weeks ahead of the Commission meeting to allow for the required processing, review and public comment period.  Following Commission approval, Transportation Planning requests OneDOT (FHWA and FTA) approval of the amendments.   &lt;br /&gt;
&lt;br /&gt;
If the project to be amended is located in an [http://www.modot.mo.gov/plansandprojects/long-range_plan/workingtogethermetropolitanplanning.htm Metrpolitan Planning Organizations (MPO)] area, the district should also initiate a TIP amendment.  Ideally, the TIP amendment precedes the STIP amendment.  Amendments in both MPO and [http://www.modot.org/plansandprojects/long-range_plan/workingtogetherregionalplanningcommissions.htm Regional Planning Commissions (RPC)] areas should have planning partner support. &lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;Scoping/Design Amendments&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
&lt;br /&gt;
A scoping or design amendment is required when a project is being added to the current fiscal year for scoping or design.  The scoping/design amendment, besides establishing a STIP job number, also triggers the establishment of an FMS number, which is the number used on timesheets.  &lt;br /&gt;
&lt;br /&gt;
These amendments require Transportation Planning approval and are taken on a monthly basis.  Amendments in the months of May, June, July, August and September are strongly discouraged because of the proximity to the draft and final STIP presentations.  Requests for amendments should be submitted to Transportation Planning no later than one week before the end of the month to allow time for processing, review and approval.  Review consists of determining if the information is correct and if the project is feasible and consistent with MoDOT’s direction.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
[[Category:121 Project Planning, Prioritization and STIP Commitments |121.06]]&lt;/div&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
</feed>