<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://epgtest3.modot.org/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Brookl</id>
	<title>Engineering_Policy_Guide - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="https://epgtest3.modot.org/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Brookl"/>
	<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=Special:Contributions/Brookl"/>
	<updated>2026-04-29T17:11:28Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.42.3</generator>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=Category_talk:146_Disadvantaged_Business_Enterprise_(DBE)&amp;diff=35297</id>
		<title>Category talk:146 Disadvantaged Business Enterprise (DBE)</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=Category_talk:146_Disadvantaged_Business_Enterprise_(DBE)&amp;diff=35297"/>
		<updated>2015-03-23T15:33:40Z</updated>

		<summary type="html">&lt;p&gt;Brookl: New page:   On the CUF form, question #10, the last form revision apparently cut of the completed sentence. It should read &amp;quot;Does the DBE furnish and install, if applicable, the Materials? Did the DB...&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;br /&gt;
&lt;br /&gt;
On the CUF form, question #10, the last form revision apparently cut of the completed sentence. It should read &amp;quot;Does the DBE furnish and install, if applicable, the Materials? Did the DBE deliver material to the site with their own and/or &#039;&#039;&#039;leased trucks&#039;&#039;&#039;&amp;quot;&lt;br /&gt;
&lt;br /&gt;
Entered by larry brooks - 314.453.1732&lt;/div&gt;</summary>
		<author><name>Brookl</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=Talk:106.4_Plant_Inspections&amp;diff=28095</id>
		<title>Talk:106.4 Plant Inspections</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=Talk:106.4_Plant_Inspections&amp;diff=28095"/>
		<updated>2012-03-01T16:05:30Z</updated>

		<summary type="html">&lt;p&gt;Brookl: New page: The First sentence in 106.4.2.6 should be modified to allow for the Contractor/Supplier to calibrate the equipment. Recomened working is shown below. See supporting data below:  Current wo...&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;The First sentence in 106.4.2.6 should be modified to allow for the Contractor/Supplier to calibrate the equipment. Recomened working is shown below. See supporting data below:&lt;br /&gt;
&lt;br /&gt;
Current wording:&lt;br /&gt;
&amp;quot;106.4.2.6 Bituminous distributors. The calibration of all distributors will be performed by district Construction and Materials personnel.&amp;quot; &lt;br /&gt;
&lt;br /&gt;
Proposed wording:&lt;br /&gt;
&amp;quot;106.4.2.6 Bituminous distributors. The calibration of all distributors will be approved by the engineer prior to use.&amp;quot;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
From:	Joseph W Schroer/SC/MODOT&lt;br /&gt;
To:	Lawrence R Brooks/D6/MODOT&lt;br /&gt;
Cc:	Dennis G Bryant/SC/MODOT@MODOT, Mitchell R Huskey/D6/MODOT@MODOT&lt;br /&gt;
Date:	03/01/2012 09:10 AM&lt;br /&gt;
Subject:	Re: Distributor Calibration Question&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Dennis and I were thinking the same thing.  That is that the distributor needs to be calibrated but not necessarily by us.  As with the plants, the contractor should have the calibration performed and have it available for our inspection.&lt;br /&gt;
&lt;br /&gt;
Joe&lt;br /&gt;
&lt;br /&gt;
From:	Lawrence R Brooks/D6/MODOT&lt;br /&gt;
To:	Dennis G Bryant/SC/MODOT@MODOT, Joseph W Schroer/SC/MODOT@MODOT&lt;br /&gt;
Date:	02/29/2012 08:14 AM&lt;br /&gt;
Subject:	Distributor Calibration Question&lt;br /&gt;
&lt;br /&gt;
I thought we had direction awhile ago not to perform distributor calibrations anymore?&lt;br /&gt;
I received a request for the old forms we used when we were calibrating them, and followed up with checking the EPG and Spec book.&lt;/div&gt;</summary>
		<author><name>Brookl</name></author>
	</entry>
	<entry>
		<id>https://epgtest3.modot.org/index.php?title=LPA_talk:136.11_Local_Public_Agency_Construction&amp;diff=25853</id>
		<title>LPA talk:136.11 Local Public Agency Construction</title>
		<link rel="alternate" type="text/html" href="https://epgtest3.modot.org/index.php?title=LPA_talk:136.11_Local_Public_Agency_Construction&amp;diff=25853"/>
		<updated>2011-06-10T13:21:44Z</updated>

		<summary type="html">&lt;p&gt;Brookl: New page:  Item 7) needs to be updated to reflect new MoDOT pipe spec effective April 2011, than allows for use of all pipe.  136.11.20 Acceptance of Small Quantities of Material on Federal-Aid Proj...&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;br /&gt;
Item 7) needs to be updated to reflect new MoDOT pipe spec effective April 2011, than allows for use of all pipe.&lt;br /&gt;
&lt;br /&gt;
136.11.20 Acceptance of Small Quantities of Material on Federal-Aid Projects&lt;br /&gt;
The guidelines below may be used to reduce the amount of engineering control and sampling and testing for relatively small quantities of materials. These guidelines are intended for use on materials that will not adversely effect the traffic-carrying capacity of the completed facility and are not to be used for concrete in major structures, permanent mainline or ramp pavements, or other structurally critical items. &lt;br /&gt;
&lt;br /&gt;
2. Sampling and Testing of Small Quantities of Miscellaneous Materials &lt;br /&gt;
&lt;br /&gt;
7) Plain concrete or clay pipe—100 feet&lt;/div&gt;</summary>